Difference between revisions of "September 3, 2019 DIRC"
From GlueXWiki
(→Agenda) |
(→Agenda) |
||
(3 intermediate revisions by 2 users not shown) | |||
Line 17: | Line 17: | ||
# Announcements: | # Announcements: | ||
+ | #* New meeting time? | ||
# Installation work: | # Installation work: | ||
#* South OB mirror replacement update | #* South OB mirror replacement update | ||
Line 28: | Line 29: | ||
#* Commissioning LUT analyses (All) | #* Commissioning LUT analyses (All) | ||
#** Cherenkov ring fit (Roman) | #** Cherenkov ring fit (Roman) | ||
− | #**[https:// | + | #** [https://www.dropbox.com/s/zfvslbyc0mf0521/presentation_3sep_2019.pdf?dl=0 Commissioning Analyses Update] (Ahmed) |
− | + | ||
− | + | ||
− | + | ||
#* Commissioning FastDIRC update (Yunjie) | #* Commissioning FastDIRC update (Yunjie) | ||
# Software/simulations | # Software/simulations |
Latest revision as of 12:59, 3 September 2019
Meeting Information
GlueX DIRC Meeting
Tuesday September 3, 2019
1:00 pm, EDT
CC F326
Connection Using Bluejeans
- To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
- To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
- To join via phone, use one of the following numbers and the Conference ID: 846453895
- US or Canada: +1 408 740 7256 or
- US or Canada: +1 888 240 2560
- More information on connecting to bluejeans is available.
Agenda
- Announcements:
- New meeting time?
- Installation work:
- South OB mirror replacement update
- Strongback modification and anodization (Stephanie, Mark)
- "Sandwich" (rear surface) mirror option to protect reflective surface (current priority for testing)
- Reflectivity measurement results (Bill, Andrew, Justin, All)
- Deadline for decision on mirror replacement is September 5. Complete schedule from Tim after this date for installation before Fall run.
- North box installation progress (Mark, All)
- Next steps (All)
- South OB mirror replacement update
- Spring 2019 DIRC Commissioning Analysis (All)
- Commissioning LUT analyses (All)
- Cherenkov ring fit (Roman)
- Commissioning Analyses Update (Ahmed)
- Commissioning FastDIRC update (Yunjie)
- Commissioning LUT analyses (All)
- Software/simulations
- FastDIRC geometry implementation and alignment work (Cris/Yunjie)
- Software overview and tasks (All)
- AOB