Difference between revisions of "September 3, 2021 DIRC"

From GlueXWiki
Jump to: navigation, search
(Agenda)
(Agenda)
Line 21: Line 21:
 
#* [https://photos.app.goo.gl/TynJtxspVdT4jjd99 Mirror production progress] and [https://photos.app.goo.gl/vwk41FEjyU5FhyCV7 installation] (Justin)
 
#* [https://photos.app.goo.gl/TynJtxspVdT4jjd99 Mirror production progress] and [https://photos.app.goo.gl/vwk41FEjyU5FhyCV7 installation] (Justin)
 
#* [https://logbooks.jlab.org/entry/3899990 Latest inspections of mirror prototypes] (Bill)
 
#* [https://logbooks.jlab.org/entry/3899990 Latest inspections of mirror prototypes] (Bill)
#* Readout and HV checks (Bill)
+
#* Readout and HV checks [https://logbooks.jlab.org/entry/3896924] [https://logbooks.jlab.org/entry/3897153] [https://logbooks.jlab.org/entry/3899247] (Bill)
 
# DIRC commissioning analyses and 2020 studies (All)
 
# DIRC commissioning analyses and 2020 studies (All)
 
#* [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Dataset_Summary#Full_REST_Production Spring and Summer 2020 data production status] and  [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Analysis_Launch Analysis launches]
 
#* [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Dataset_Summary#Full_REST_Production Spring and Summer 2020 data production status] and  [https://halldweb.jlab.org/wiki-private/index.php/Spring_2020_Analysis_Launch Analysis launches]

Revision as of 07:50, 3 September 2021

Meeting Information

GlueX DIRC Meeting
Friday September 2, 2021
10:00 am, ET
Remote only

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
    • Collaboration Meeting Sept 22-24
  2. Hardware work (All)
  3. DIRC commissioning analyses and 2020 studies (All)
  4. AOB