Difference between revisions of "September 4, 2015 PID Upgrade"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 18: Line 18:
  
 
# Announcements
 
# Announcements
# Detector support structure requirements
+
# [https://halldweb.jlab.org/wiki/index.php/File:Structure9.4.15.pdf Detector support structure requirements] (All)
# Additional design work to be completed with project funds?
+
# Additional design work to be completed with project funds? (All)
 
#* Main detector support structure
 
#* Main detector support structure
 
#* Shipping crate
 
#* Shipping crate

Revision as of 09:49, 4 September 2015

Meeting Information

GlueX PID Upgrade Meeting
Friday, September 4, 2015
11 am, EDT
For those people at Jefferson Lab, the meeting will be in room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Detector support structure requirements (All)
  3. Additional design work to be completed with project funds? (All)
    • Main detector support structure
    • Shipping crate
    • Expansion volume:
      • Final design for focusing optics box
      • MaPMT/Electronics module structure and mounting on fused silica window
  4. Planning for October review (All)
    • TDR updates
    • Program Management
  5. AOB