Difference between revisions of "September 4, 2015 PID Upgrade"

From GlueXWiki
Jump to: navigation, search
(Agenda)
Line 30: Line 30:
 
#* TDR updates
 
#* TDR updates
 
#* Program Management
 
#* Program Management
 +
# [https://halldweb1.jlab.org/wiki/index.php/File:Calibration_Sep4_v4.pdf Calibration with data]
 
# AOB
 
# AOB

Revision as of 11:00, 4 September 2015

Meeting Information

GlueX PID Upgrade Meeting
Friday, September 4, 2015
11 am, EDT
For those people at Jefferson Lab, the meeting will be in room A110

Connection Using Bluejeans

  1. To join via Polycom room system go to the IP Address: 199.48.152.152 (bjn.vc) and enter the meeting ID: 846453895.
  2. To join via a Web Browser, go to the page [1] https://bluejeans.com/846453895 .
  3. To join via phone, use one of the following numbers and the Conference ID: 846453895
    • US or Canada: +1 408 740 7256 or
    • US or Canada: +1 888 240 2560
  4. More information on connecting to bluejeans is available.

Agenda

  1. Announcements
  2. Detector support structure requirements (All)
    • Do we need to require that the bars can be "easily" moved out of the active area of the detector for other experiments (eg. PrimeX)?
    • What additional cost and risk are implied by such a design?
  3. Additional design work to be completed with project funds? (All)
    • Main detector support structure
    • Shipping crate
    • Expansion volume:
      • Final design for focusing optics box
      • MaPMT/Electronics module structure and mounting on fused silica window
  4. Planning for October review (All)
    • TDR updates
    • Program Management
  5. Calibration with data
  6. AOB