September 6, 2006 Software

From GlueXWiki
Revision as of 14:18, 6 September 2006 by Davidl (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Agenda:

  1. Collaboration meeting planning for software workshop
  2. BCAL beam test software status
  3. Offsite analysis of BCAL beam test data
  4. AOT



Collaboration meeting planning for software workshop

Proposed agenda for discussion:

  1. What are the most pressing questions we need to answer by spring?
  2. What level of reconstruction is needed from each subsystem in order to answer the questions?
  3. What (if any) modifications to the simulation are needed to test the reconstruction code?
  4. What are the appropriate milestones for the software workshop that will ensure the needed reconstruction levels are met?
  5. Who will be doing the work and presenting it at the workshop?

BCAL beam test software status

Offsite analysis of BCAL beam test data

Things to decide

  • Data format for offline DST (CODA, ROOT, ...)
  • Where DST are generated (JLab or UConn)
  • Selecting "good" runs