Difference between revisions of "SoftwareReview October 25"

From GlueXWiki
Jump to: navigation, search
(Created page with "__TOC__ Software Review Planning Meeting Friday October 25, 2013. 2013 Software Review Page ==Connecting== Phone: * +1-866-740-1260 : US+Canada * +1-30...")
 
(Overview Talk by Curtis)
Line 20: Line 20:
 
* [3-5] GlueX Physics an Amplitude Analysis
 
* [3-5] GlueX Physics an Amplitude Analysis
 
* [6-12] Walk through major accomplishments. This includes
 
* [6-12] Walk through major accomplishments. This includes
** (i) De�fined Data Formats: EVIO, REST, PART (root) data format.
+
** (i) Defined Data Formats: EVIO, REST, PART (root) data format.
 
** (ii) December 2012 data challenge producing about 70% of the data we expect in 2016 with 10**7 running. What did we learn?  
 
** (ii) December 2012 data challenge producing about 70% of the data we expect in 2016 with 10**7 running. What did we learn?  
 
** iii) Job management/ Work flow exercises.
 
** iii) Job management/ Work flow exercises.
 
** (iv) Implementation of CCDB into analysis framework.
 
** (iv) Implementation of CCDB into analysis framework.
 
** (v) development of analysis framework to initially facilitate the PID upgrade work, and ultimately develop the proposal in June.
 
** (v) development of analysis framework to initially facilitate the PID upgrade work, and ultimately develop the proposal in June.
** (vi) High-level analysis tools: kinematic �fitting, multivariate analysis, ....
+
** (vi) High-level analysis tools: kinematic fitting, multivariate analysis, ....
 
** (vii) July 2013 Software Workshop.
 
** (vii) July 2013 Software Workshop.
** (viii) Code and algorithm improvements: Particle Identifi�cation, BCAL simulation and reconstruction, new tracking for spiraling tracks.
+
** (viii) Code and algorithm improvements: Particle Identification, BCAL simulation and reconstruction, new tracking for spiraling tracks.
 
** (ix) Start work on Level-III trigger and algorithms
 
** (ix) Start work on Level-III trigger and algorithms
 
** (x) Online Data Challenge with level-III trigger.
 
** (x) Online Data Challenge with level-III trigger.

Revision as of 13:05, 21 October 2013

Software Review Planning Meeting Friday October 25, 2013.

2013 Software Review Page

Connecting

Phone:

  • +1-866-740-1260 : US+Canada
  • +1-303-248-0285 : International
  • then enter participant code: 3421244# (remember the "#").
  • or www.readytalk.com (and code without the #)

Outlines of Talks

We agreed that we would post a list of slides for the talks at the 12-Gev Software Review, but that we would most likely not have a meeting this week.

Morning Session (30 minutes)

Overview Talk by Curtis

  • [1-2] Title + Outline
  • [3-5] GlueX Physics an Amplitude Analysis
  • [6-12] Walk through major accomplishments. This includes
    • (i) Defined Data Formats: EVIO, REST, PART (root) data format.
    • (ii) December 2012 data challenge producing about 70% of the data we expect in 2016 with 10**7 running. What did we learn?
    • iii) Job management/ Work flow exercises.
    • (iv) Implementation of CCDB into analysis framework.
    • (v) development of analysis framework to initially facilitate the PID upgrade work, and ultimately develop the proposal in June.
    • (vi) High-level analysis tools: kinematic fitting, multivariate analysis, ....
    • (vii) July 2013 Software Workshop.
    • (viii) Code and algorithm improvements: Particle Identification, BCAL simulation and reconstruction, new tracking for spiraling tracks.
    • (ix) Start work on Level-III trigger and algorithms
    • (x) Online Data Challenge with level-III trigger.
    • (xi) Conversion to GEANT4.
  • [13] GlueX Running { Phase I,II,III,IV, ...
  • [14-17] Timeline to Physics with tasks
    • (i) Data Challenges
    • (ii) Calibration and Commissioning
    • (iii) Physics Analysis Planning
    • (iv) Level-III Trigger Development
    • (v) Testing of Work flow Developments.
  • [18] Manpower and Resources
  • [19-20] Summary/Conclusions

Afternoon Session (90 minutes)