Difference between revisions of "Some specifications on PMTs"

From GlueXWiki
Jump to: navigation, search
Line 12: Line 12:
 
: (counter with ~20 MeV)
 
: (counter with ~20 MeV)
 
* The rate is about 4 times larger for the last counter (at 3 GeV)
 
* The rate is about 4 times larger for the last counter (at 3 GeV)
 +
 +
''' Operating gain '''
 +
* Assume 4 MHz counter rate, 400 p.e., 50 &mA anode current
 +
* The maximum anode current is typically 100 &mA. We have to operate the tubes at least 2 times smaller current.

Revision as of 15:59, 14 September 2012

Light yield estimates

  1. 5 mm thick scintillators
  2. 10000 initial photons per tagged electron
    • assume that 2000 photons are collected (20 % light collection efficiency)
    • 400 p.e. (assuming 20% quantum efficiency)


Counter rates (according to the latest Dan's design)

  • 1.1 μ A electron current, 10^{{-4}}X_{{0}} radiator
(corresponds to the photon flux of 5x10^{{7}} phot/sec in the cohrent peak region)
  • Counter rate around E_gamma = 9 GeV: 1 - 1.5 MHz
(counter with ~20 MeV)
  • The rate is about 4 times larger for the last counter (at 3 GeV)

Operating gain

  • Assume 4 MHz counter rate, 400 p.e., 50 &mA anode current
  • The maximum anode current is typically 100 &mA. We have to operate the tubes at least 2 times smaller current.