Dead-end pages

From GlueXWiki
Jump to: navigation, search

The following pages do not link to other pages in GlueXWiki.

Showing below up to 500 results in range #1 to #500.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. (12-6-06)
  2. (revised version as of 4-25-2014)
  3. 03/27/2020
  4. 03/31/2020
  5. 04/01/2020
  6. 04/08/2020
  7. 04/11/2020
  8. 04/15/2020
  9. 04/21/2020
  10. 04/28/2020
  11. 05/06/2020
  12. 05/20/2020
  13. 05/27/2020
  14. 06/11/2020
  15. 06/17/2020
  16. 07/07/2020
  17. 07/22/2020
  18. 07/29/2020
  19. 08/12/2020
  20. 08/19/2020
  21. 09/09/2020
  22. 09/17/2019
  23. 10/09/2019
  24. 10/13/2020
  25. 10/23/2019
  26. 11/10/2020
  27. 11/13/2019
  28. 11/27/2019
  29. 1250V Background Comparison
  30. 125 MHz Clock test
  31. 1GeV photons in TOF
  32. 2007-02-28
  33. 2007-03-21
  34. 2007-04-18
  35. 2007-05-09
  36. 2007-05-23
  37. 2007-07-11
  38. 2007-09-26
  39. 2008-04-09
  40. 2008-04-16
  41. 2008-05-21
  42. 2008-06-04
  43. 2008-06-18
  44. 2008-07-02
  45. 2008-07-16
  46. 2008-11-05
  47. 2008-12-03
  48. 2008 02 15 CDC Task List
  49. 2009-02-11
  50. 2009-02-25
  51. 2009-03-11
  52. 2009-03-25
  53. 2009-04-08
  54. 2009-04-22
  55. 2009-09-21
  56. 2009-10-08
  57. 2010-10-06
  58. 2011 Hall B Bcal Goals
  59. 2012 Software Review Closeout Notes
  60. 20140625 BCAL Timing
  61. 2015 October 14 DIRC Project Review
  62. 2017-01 recon ver02 plans
  63. 20200831 sdobbs PID notes
  64. 2020 Data Production
  65. 2020 Winter - 2021 Spring
  66. 2021-07-29
  67. 2022 Data Production
  68. 2023 Data Production
  69. 22 February 2008
  70. 2π0 simulation
  71. 35% drawing by IHEP provided in April/May 2007
  72. 55Fe vs cosmics
  73. ADC Peak Amplitude during the run period
  74. ADC data
  75. AMCDrawings Used for calculations
  76. ANSYS simulations
  77. ASIC design optimizations
  78. ASU polarimeter drawings
  79. Abbottd-info-needed-31-aug-2011
  80. Accelerometers with cheap Knocking sensor
  81. Access HMI screens through VNC
  82. Accessing the JLab Picture Archive
  83. Action Items
  84. Active Base Radiation Tests
  85. Active Collimator Interface Specification
  86. Active Collimator Preamplifier Cabling and Electronics
  87. Adding a new user
  88. Addressing ERR review recommendations
  89. After mass flow controller recalibration
  90. Agenda
  91. Agenda 060515
  92. Agenda 060609
  93. Alarms for voltages (Nerses)
  94. Alberta CFDs
  95. Alignment
  96. Alignment and Calibration
  97. Alignment data
  98. Alignment plots
  99. All modules (with SICCAS crystals) are removed
  100. Alternative readout
  101. Amorphous radiator/harp ladder requirements
  102. Analysis DParticleCombo
  103. Analysis Examples
  104. Analysis FAQ
  105. Analysis FAQ : Frequently Asked Questions
  106. Analysis JEventProcessor
  107. Analysis Miscellaneous
  108. Analysis Page
  109. Analysis Plan
  110. Analysis Shift Meeting Agenda, December 05 - December 07, 2021
  111. Analysis Shift Meeting Agenda, December 05 - December 11, 2021
  112. Analysis Shift Meeting Agenda, December 12 - December 18, 2021
  113. Analysis Shift Meeting Agenda, November 07 - November 13, 2021
  114. Analysis Shift Meeting Agenda, November 14 - November 20, 2021
  115. Analysis Shift Meeting Agenda, November 21 - November 27, 2021
  116. Analysis Shift Meeting Agenda, November 28 - December 04, 2021
  117. Analysis Studies Fall2016
  118. Analysis Studies Spring2017
  119. Analysis software wishlist from May 2020 CM
  120. Analyze Analysis Trees
  121. Andrei's recipe for BCAL Timing Calibration
  122. Annotated Git session using the sim-recon repository
  123. Apr. 14, 2008 Tracking CDC/FDC
  124. Apr. 4, 2008 Tracking CDC/FDC
  125. Apr 02,2020 Tech group meeting
  126. Apr 08,2020 Tech group meeting
  127. Apr 10,2020 Tech group meeting
  128. Apr 12, 2011 Calorimetry
  129. Apr 12, 2013 Design Meeting
  130. Apr 13,2020 Tech group meeting
  131. Apr 14, 2011 SiPM Electrical and Cooling
  132. Apr 15,2020 Tech group meeting
  133. Apr 15, 2010 Calorimetry
  134. Apr 16,2013 Readout
  135. Apr 16, 2009 Calorimetry
  136. Apr 17,2020 Tech group meeting
  137. Apr 18, 2013 SiPM Electrical and Cooling
  138. Apr 19, 2011 Readout
  139. Apr 20,2020 Tech group meeting
  140. Apr 21
  141. Apr 22,2020 Tech group meeting
  142. Apr 24,2020 Tech group meeting
  143. Apr 25, 2013 SiPM Electrical and Cooling
  144. Apr 26, 2013 Design Meeting
  145. Apr 27,2020 Tech group meeting
  146. Apr 28, 2011 SiPM Electrical and Cooling
  147. Apr 29,2020 Tech group meeting
  148. Apr 30,2013 Readout
  149. Apr 7
  150. Apr 7, 2011 SiPM Electrical and Cooling
  151. Apr 9, 2009 Readout
  152. Apr 9, 2024 HallD AI/ML meeting
  153. April 06, 2009 Tracking CDC/FDC
  154. April 07, 2022 CPP Design/Install Meeting
  155. April 08, 2013, Physics Working Group
  156. April 08, 2021 CPP Design Meeting
  157. April 09, 2024 KLONG CPS Design Meeting
  158. April 1, 2020 CPP Design Meeting
  159. April 1, 2022 Tech group SAD meeting
  160. April 1-7
  161. April 10, 2013 Tracking CDC/FDC
  162. April 11,2012 e-mail from Curtis regard RMP for Software Review
  163. April 11, 2011 (11:30AM), Physics Working Group
  164. April 11, 2014 Design Meeting
  165. April 12, 2010 (11AM), Physics Working Group
  166. April 12, 2011 SiPM Electrical and Cooling
  167. April 12, 2023, FCAL Insert Installation Meeting
  168. April 13, 2009 (11AM), Physics Working Group
  169. April 13, 2012 Fab Meeting
  170. April 13, 2023
  171. April 14, 2022 DIRC
  172. April 14, 2022 KLONG Phase II Design Meeting
  173. April 15, 2011 Design/Fab mtg
  174. April 15, 2019
  175. April 15, 2022 Tech group SAD meeting
  176. April 19, 2011 SiPM Electrical and Cooling
  177. April 19, 2013 PID Upgrade
  178. April 2, 2020 CPP Design Meeting
  179. April 20, 2009 Tracking CDC/FDC
  180. April 20, 2012 (4:00PM), Physics Working Group
  181. April 20, 2023
  182. April 20, 2023, FCAL Insert Installation Meeting
  183. April 21, 2022 CPP Design/Install Meeting
  184. April 22, 2013, Physics Working Group
  185. April 22, 2021 CPP Design Meeting
  186. April 22, 2022 Tech group SAD meeting
  187. April 23, 2020 CPP Design Meeting
  188. April 23, 2024 KLONG CPS Design Meeting
  189. April 25, 2011 (11:30AM), Physics Working Group
  190. April 26, 2011 SiPM Electrical and Cooling
  191. April 26, 2023, FCAL Insert Installation Meeting
  192. April 27, 2009 (11AM), Physics Working Group
  193. April 27, 2012 (3:00PM), Rare eta-decay meeting.
  194. April 27, 2023
  195. April 29, 2022 Tech group SAD meeting
  196. April 3, 2017
  197. April 30, 2012 Design Meeting
  198. April 4, 2015
  199. April 4, 2016
  200. April 5, 2013 PID Upgrade
  201. April 5, 2023, FCAL Insert Installation Meeting
  202. April 6, 2022 FCAL 2 Design Meeting
  203. April 6, 2023
  204. April 8, 2022 Tech group SAD meeting
  205. April 8-14
  206. Assmbly Hub for the CDC
  207. Attenuation Results from Radphi
  208. Aug 02,2020 Tech group meeting
  209. Aug 1, 2014 Design Meeting
  210. Aug 11, 2011 SiPM Electrical and Cooling
  211. Aug 14, 2011 Replacement Solenoid
  212. Aug 15, 2023 HallD AI/ML meeting
  213. Aug 16, 2011 Calorimetry
  214. Aug 16, 2011 SiPM Electrical and Cooling
  215. Aug 19, 2010 Calorimetry
  216. Aug 2, 2011 Calorimetry
  217. Aug 20, 2009 Calorimetry
  218. Aug 21, 2012 Readout
  219. Aug 22, 2023 HallD AI/ML meeting
  220. Aug 23, 2011 Readout
  221. Aug 23, 2011 SiPM Electrical and Cooling
  222. Aug 25, 2011 SiPM Electrical and Cooling
  223. Aug 27, 2009 Readout
  224. Aug 29, 2014 Design Meeting
  225. Aug 30, 2011 Calorimetry
  226. Aug 30, 2011 Readout
  227. Aug 30, 2011 SiPM Electrical and Cooling
  228. Aug 30, 2014 Design Meeting
  229. Aug 30, 2023 HallD AI/ML meeting
  230. Aug 31, 2023 HallD AI/ML meeting
  231. Aug 4, 2011 SiPM Electrical and Cooling
  232. Aug 6,2013 Readout
  233. Aug 8, 2023 HallD AI/ML meeting
  234. Aug 9, 2011 Readout
  235. Aug 9, 2011 SiPM Electrical and Cooling
  236. August 09, 2022 FCAL Insert Installation Meeting
  237. August 1, 2012 Tracking CDC/FDC
  238. August 10, 2006
  239. August 10, 2009 Tracking CDC/FDC
  240. August 10, 2012 Design Meeting
  241. August 10, 2015
  242. August 10, 2022 FCAL Insert Installation Meeting
  243. August 10, 2023
  244. August 11, 2022
  245. August 12, 2010 CDC Meeting
  246. August 12, 2010 Des/Fab Meeting
  247. August 12, 2011 Design Meeting
  248. August 12, 2013, Physics Working Group
  249. August 12, 2022 Tech group meeting
  250. August 14, 2006 Software
  251. August 14, 2013 tracking CDC/FDC
  252. August 15, 2012 traccking CDC/FDC
  253. August 15, 2019 FCAL Insert Design Meeting
  254. August 16, 2010 (11AM), Physics Working Group
  255. August 17, 2006
  256. August 17, 2009 (11AM), Physics Working Group
  257. August 17, 2010 Tracking CDC/FDC
  258. August 17, 2011 Tracking CDC/FDC
  259. August 17, 2012 Fab Meeting
  260. August 17, 2023
  261. August 18, 2022
  262. August 19, 2010 Des/Fab Meeting
  263. August 19, 2021 KLONG Design Meeting
  264. August 2, 2010 (11AM), Physics Working Group
  265. August 20, 2012 PID Upgrade
  266. August 23, 2013 PID Upgrade
  267. August 24, 2009 Tracking CDC/FDC
  268. August 24, 2012 Design Meeting
  269. August 24, 2023
  270. August 25, 2008 Tracking CDC/FDC
  271. August 25, 2022
  272. August 26, 2010 Des/Fab Meeting
  273. August 26, 2013, Physics Working Group
  274. August 26, 2021 CPP Design Meeting
  275. August 27, 2012 (11:30AM), Physics Working Group
  276. August 28, 2006 Software
  277. August 28, 2013 tracking CDC/FDC
  278. August 29, 2011 (11:30AM), Physics Working Group
  279. August 29, 2012 traccking CDC/FDC
  280. August 29, 2012 tracking CDC/FDC
  281. August 29, 2022 FCAL Insert Installation Meeting
  282. August 3, 2009 (11AM), Physics Working Group
  283. August 3, 2011 Tracking CDC/FDC
  284. August 3, 2022 DIRC analysis
  285. August 3, 2023
  286. August 30, 2010 (11AM), Physics Working Group
  287. August 30, 2023 Calorimeter
  288. August 31, 2009 (11AM), Physics Working Group
  289. August 31, 2011 Tracking CDC/FDC
  290. August 31, 2023
  291. August 4, 2022
  292. August 5, 2011 Design/Fab Meeting
  293. August 5, 2022 Tech group meeting
  294. August 7, 2006 Software
  295. August 8, 2014
  296. August 9, 2010 CDC Meeting
  297. August 9, 2013 PID Upgrade
  298. Automated Timing Calibrations
  299. Available EventStore skims
  300. B1pi monitoring dashboard schema
  301. B1pi tests Sep. 2011
  302. BCAL-Chiller.MPOD Interlock.jpg
  303. BCAL Action Items and Working Tasks
  304. BCAL Angular Coverage
  305. BCAL Beam Test Plots, November 20, 2006
  306. BCAL Calibration
  307. BCAL Cell Cross Talk
  308. BCAL Costhe Efficiency
  309. BCAL Gain Calibration
  310. BCAL Hybrid Module Cosmic Tests
  311. BCAL Installation
  312. BCAL Installation Schedule
  313. BCAL Key Documents
  314. BCAL LED Installation Photos
  315. BCAL Monitoring
  316. BCAL Pb Sheet Widths
  317. BCAL Preparations for spring 2016
  318. BCAL Readout Review
  319. BCAL Readout Segmentation Task group Meeting: Aug 12, 2011
  320. BCAL Readout Segmentation Task group Meeting: Aug 19, 2011
  321. BCAL Readout Segmentation Task group Meeting: Aug 5, 2011
  322. BCAL Readout Segmentation Task group Meeting: Jul 22, 2011
  323. BCAL Readout Segmentation Task group Meeting: Jun 23, 2011
  324. BCAL Readout Segmentation Task group Meeting: Jun 30, 2011
  325. BCAL Readout Segmentation Task group Meeting: Jun 9, 2011
  326. BCAL Readout Segmentation Task group Meeting: May 19, 2011
  327. BCAL Readout Segmentation Task group Meeting: May 26, 2011
  328. BCAL Readout Segmentation Task group Meeting: Nov. 14, 2011
  329. BCAL Readout Segmentation Task group Meeting: Nov. 21, 2011
  330. BCAL Readout Segmentation Task group Meeting: Nov. 28, 2011
  331. BCAL Readout Segmentation Task group Meeting: Oct. 10, 2011
  332. BCAL Readout Segmentation Task group Meeting: Oct. 3, 2011
  333. BCAL Readout Segmentation Task group Meeting: Sep 19, 2011
  334. BCAL Readout Segmentation Task group Meeting: Sep 2, 2011
  335. BCAL Readout Segmentation Task group Meeting: Sep 26, 2011
  336. BCAL Reconstruction Algorithms
  337. BCAL Reconstruction Issues
  338. BCAL Reconstruction Status Update 20130501
  339. BCAL Reconstruction Task list
  340. BCAL Stand-Alone Monte Carlo - energy resolution
  341. BCAL Startup Checkout List 2014
  342. BCAL TDC Timing
  343. BCAL calibration links, 2020, PrimEx, SRC
  344. BCAL cosmics
  345. BCAL hadronic efficiencies
  346. BCAL reconstruction 01/16/2012
  347. BCAL reconstruction 03/07/2013
  348. BCAL reconstruction 10/19/11
  349. BCAL reconstruction 11/28/11
  350. BCAL reconstruction 8/24/11
  351. BCAL reconstruction 9/21/11
  352. BCAL reconstruction test with pi0
  353. BCal Beam Test Plots, April 10, 2007
  354. BCal Beam Test Plots, April 4, 2007
  355. BCal Beam Test Plots, August 28, 2007
  356. BCal Beam Test Plots, December 15, 2006
  357. BCal Beam Test Plots, December 19, 2006
  358. BCal Beam Test Plots, March 8, 2007
  359. BCal Beam Test Plots, May 8, 2007
  360. BCal Raw ADC Plots, June 18, 2007
  361. BCal Timing Resolution Note
  362. BLTWG Meeting 01/19/2015
  363. BLTWG Meeting 01/21/2013
  364. BLTWG Meeting 10/11/2007
  365. BLTWG Meeting 11/16/2007
  366. BLTWG Meeting 11/29/2007
  367. BLTWG Meeting 11/8/2007
  368. BLTWG Meeting 12/20/2007
  369. BLTWG Meeting 4/17/2008
  370. BLTWG Meeting 4/3/2008
  371. BLTWG Meeting 5/1/2008
  372. BLTWG Meeting 5/29/2008
  373. BLTWG Meeting 9/13/2007
  374. BLTWG Meeting 9/27/2007
  375. Baby BCAL at JLab
  376. Baby BCAL at JLab Photos
  377. Background studies
  378. Bar box darkening procedure
  379. Barrel Calorimeter
  380. Basic formalism for X-ray monochromator resolution
  381. Bcal Action Item Tracker
  382. Beam-induced background
  383. Beam-induced backgrounds
  384. Beam Data
  385. Beam Test Analyses and Results
  386. Beam Test Meeting Mon. Apr. 02, 2012
  387. Beam Test Meeting Mon. Apr. 09, 2012
  388. Beam Test Meeting Mon. Apr. 16, 2012
  389. Beam Test Meeting Mon. Apr. 23, 2012
  390. Beam Test Meeting Mon. Apr. 30, 2012
  391. Beam Test Meeting Mon. Mar. 19, 2012
  392. Beam Test Meeting Mon. Mar. 26, 2012
  393. Beam Test Meeting Mon. May. 07, 2012
  394. Beam Test Shift Schedule
  395. Beam commissioning: Fall 2014
  396. Beam commissioning in Fall 2014
  397. Beam halo measurements to assess background for PRad target TAC runs.
  398. Beam request (expect to run in 2021)
  399. Beam request (run in 2021)
  400. Beni's PMT replacement email
  401. Bggen-2017-01-ver03
  402. Bggen-2017-01-ver03.6
  403. Bggen-2018-01-ver02.2 bggen
  404. Bggen-2018-01-ver02 bggen
  405. Bggen-2018-08-ver02.2 bggen
  406. Bggen-2018-08-ver02 bggen
  407. Bill's to do list
  408. Blake CAP08 Abstract
  409. Bleed-through tests from other hall bunches
  410. BoardAgenda201001
  411. BoardAgenda201005
  412. BoardAgenda201009
  413. BoardAgenda201102
  414. BoardAgenda201105
  415. BoardAgenda201110
  416. BoardAgenda201202
  417. BoardAgenda201205
  418. BoardAgenda201210
  419. BoardAgenda201302
  420. BoardAgenda201306
  421. BoardAgenda201310
  422. BoardAgenda201402
  423. BoardAgenda201610
  424. BoardAgenda201702
  425. BoardAgenda201705
  426. BoardAgenda201710
  427. BoardAgenda201809
  428. BoardAgenda201905
  429. Brief Report on Yianna's ADC fits for SensL SiPMs
  430. Build on Github Pull Request
  431. Building HDDM support software
  432. Building Private Versions of GlueX Software: my halld build jlab
  433. Building a roof over src
  434. C++11 in Hall D Online
  435. CAEN V792N ADC
  436. CBAR Splitoff Software
  437. CB member who changes institutions
  438. CCAL preparation
  439. CCDB 0.09
  440. CCDB 1.00
  441. CCDB Author List Maintenance
  442. CCDB Example Session
  443. CCDB Schema Changes in Version 1.00
  444. CCDB Tables BCAL
  445. CCDB Tables CDC
  446. CCDB Tables FCAL
  447. CCDB Tables FDC
  448. CCDB Tables Photon Beam
  449. CCDB Tables Start Counter
  450. CCDB Tables TOF
  451. CCDB Wishlist
  452. CD3 geometry forward-region material effects
  453. CDC/FDC ASIC Discussion Meeting, September 3, 2008
  454. CDC/FDC Gas System GUI
  455. CDC 06 02 2008
  456. CDC 14 11 2007
  457. CDC 20 02 2008
  458. CDC 216 channels
  459. CDC 21 05 2008
  460. CDC 21 11 2007
  461. CDC 23 01 2008
  462. CDC 28 11 2007
  463. CDC 50/50 premix
  464. CDC 50 50
  465. CDC 55 45
  466. CDC 60 40
  467. CDC B field
  468. CDC Construction Complications Tracking
  469. CDC Electrical Hook Up Photos
  470. CDC Future MC Studies Discussion, October 1, 2008
  471. CDC HVB version 3
  472. CDC HV scan
  473. CDC HV scan instructions October 2021
  474. CDC High Voltage Board (HVB)
  475. CDC NIM Elton
  476. CDC Pedestal Studies
  477. CDC Photos 2008
  478. CDC Readiness Checklist
  479. CDC Straw Sag photos
  480. CDC alcohol
  481. CDC amp dedx
  482. CDC and FDC readout tests
  483. CDC bad channels
  484. CDC channel numbers
  485. CDC commissioning plan
  486. CDC events
  487. CDC finding signal duration
  488. CDC garfield calcs
  489. CDC garfield drift vs gas mix
  490. CDC garfield xt table comparison
  491. CDC geometry April09
  492. CDC max drift times from Garfield
  493. CDC more garfield calcs
  494. CDC odd events
  495. CDC old & new preamp noise scope trace study
  496. CDC old preamp then and now
  497. CDC peak lengths
  498. CDC preamp LV checkup
  499. CDC prototype drift times
  500. CDC prototype fADC data

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)