Dead-end pages

From GlueXWiki
Jump to: navigation, search

The following pages do not link to other pages in GlueXWiki.

Showing below up to 500 results in range #51 to #550.

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)

  1. 2009-03-11
  2. 2009-03-25
  3. 2009-04-08
  4. 2009-04-22
  5. 2009-09-21
  6. 2009-10-08
  7. 2010-10-06
  8. 2011 Hall B Bcal Goals
  9. 2012 Software Review Closeout Notes
  10. 20140625 BCAL Timing
  11. 2015 October 14 DIRC Project Review
  12. 2017-01 recon ver02 plans
  13. 20200831 sdobbs PID notes
  14. 2020 Data Production
  15. 2020 Winter - 2021 Spring
  16. 2021-07-29
  17. 2022 Data Production
  18. 2023 Data Production
  19. 22 February 2008
  20. 2π0 simulation
  21. 35% drawing by IHEP provided in April/May 2007
  22. 55Fe vs cosmics
  23. ADC Peak Amplitude during the run period
  24. ADC data
  25. AMCDrawings Used for calculations
  26. ANSYS simulations
  27. ASIC design optimizations
  28. ASU polarimeter drawings
  29. Abbottd-info-needed-31-aug-2011
  30. Accelerometers with cheap Knocking sensor
  31. Access HMI screens through VNC
  32. Accessing the JLab Picture Archive
  33. Action Items
  34. Active Base Radiation Tests
  35. Active Collimator Interface Specification
  36. Active Collimator Preamplifier Cabling and Electronics
  37. Adding a new user
  38. Addressing ERR review recommendations
  39. After mass flow controller recalibration
  40. Agenda
  41. Agenda 060515
  42. Agenda 060609
  43. Alarms for voltages (Nerses)
  44. Alberta CFDs
  45. Alignment
  46. Alignment and Calibration
  47. Alignment data
  48. Alignment plots
  49. All modules (with SICCAS crystals) are removed
  50. Alternative readout
  51. Amorphous radiator/harp ladder requirements
  52. Analysis DParticleCombo
  53. Analysis Examples
  54. Analysis FAQ
  55. Analysis FAQ : Frequently Asked Questions
  56. Analysis JEventProcessor
  57. Analysis Miscellaneous
  58. Analysis Page
  59. Analysis Plan
  60. Analysis Shift Meeting Agenda, December 05 - December 07, 2021
  61. Analysis Shift Meeting Agenda, December 05 - December 11, 2021
  62. Analysis Shift Meeting Agenda, December 12 - December 18, 2021
  63. Analysis Shift Meeting Agenda, November 07 - November 13, 2021
  64. Analysis Shift Meeting Agenda, November 14 - November 20, 2021
  65. Analysis Shift Meeting Agenda, November 21 - November 27, 2021
  66. Analysis Shift Meeting Agenda, November 28 - December 04, 2021
  67. Analysis Studies Fall2016
  68. Analysis Studies Spring2017
  69. Analysis software wishlist from May 2020 CM
  70. Analyze Analysis Trees
  71. Andrei's recipe for BCAL Timing Calibration
  72. Annotated Git session using the sim-recon repository
  73. Apr. 14, 2008 Tracking CDC/FDC
  74. Apr. 4, 2008 Tracking CDC/FDC
  75. Apr 02,2020 Tech group meeting
  76. Apr 08,2020 Tech group meeting
  77. Apr 10,2020 Tech group meeting
  78. Apr 12, 2011 Calorimetry
  79. Apr 12, 2013 Design Meeting
  80. Apr 13,2020 Tech group meeting
  81. Apr 14, 2011 SiPM Electrical and Cooling
  82. Apr 15,2020 Tech group meeting
  83. Apr 15, 2010 Calorimetry
  84. Apr 16,2013 Readout
  85. Apr 16, 2009 Calorimetry
  86. Apr 17,2020 Tech group meeting
  87. Apr 18, 2013 SiPM Electrical and Cooling
  88. Apr 19, 2011 Readout
  89. Apr 20,2020 Tech group meeting
  90. Apr 21
  91. Apr 22,2020 Tech group meeting
  92. Apr 24,2020 Tech group meeting
  93. Apr 25, 2013 SiPM Electrical and Cooling
  94. Apr 26, 2013 Design Meeting
  95. Apr 27,2020 Tech group meeting
  96. Apr 28, 2011 SiPM Electrical and Cooling
  97. Apr 29,2020 Tech group meeting
  98. Apr 30,2013 Readout
  99. Apr 7
  100. Apr 7, 2011 SiPM Electrical and Cooling
  101. Apr 9, 2009 Readout
  102. Apr 9, 2024 HallD AI/ML meeting
  103. April 06, 2009 Tracking CDC/FDC
  104. April 07, 2022 CPP Design/Install Meeting
  105. April 08, 2013, Physics Working Group
  106. April 08, 2021 CPP Design Meeting
  107. April 09, 2024 KLONG CPS Design Meeting
  108. April 1, 2020 CPP Design Meeting
  109. April 1, 2022 Tech group SAD meeting
  110. April 1-7
  111. April 10, 2013 Tracking CDC/FDC
  112. April 11,2012 e-mail from Curtis regard RMP for Software Review
  113. April 11, 2011 (11:30AM), Physics Working Group
  114. April 11, 2014 Design Meeting
  115. April 12, 2010 (11AM), Physics Working Group
  116. April 12, 2011 SiPM Electrical and Cooling
  117. April 12, 2023, FCAL Insert Installation Meeting
  118. April 13, 2009 (11AM), Physics Working Group
  119. April 13, 2012 Fab Meeting
  120. April 13, 2023
  121. April 14, 2022 DIRC
  122. April 14, 2022 KLONG Phase II Design Meeting
  123. April 15, 2011 Design/Fab mtg
  124. April 15, 2019
  125. April 15, 2022 Tech group SAD meeting
  126. April 19, 2011 SiPM Electrical and Cooling
  127. April 19, 2013 PID Upgrade
  128. April 2, 2020 CPP Design Meeting
  129. April 20, 2009 Tracking CDC/FDC
  130. April 20, 2012 (4:00PM), Physics Working Group
  131. April 20, 2023
  132. April 20, 2023, FCAL Insert Installation Meeting
  133. April 21, 2022 CPP Design/Install Meeting
  134. April 22, 2013, Physics Working Group
  135. April 22, 2021 CPP Design Meeting
  136. April 22, 2022 Tech group SAD meeting
  137. April 23, 2020 CPP Design Meeting
  138. April 23, 2024 KLONG CPS Design Meeting
  139. April 25, 2011 (11:30AM), Physics Working Group
  140. April 26, 2011 SiPM Electrical and Cooling
  141. April 26, 2023, FCAL Insert Installation Meeting
  142. April 27, 2009 (11AM), Physics Working Group
  143. April 27, 2012 (3:00PM), Rare eta-decay meeting.
  144. April 27, 2023
  145. April 29, 2022 Tech group SAD meeting
  146. April 3, 2017
  147. April 30, 2012 Design Meeting
  148. April 4, 2015
  149. April 4, 2016
  150. April 5, 2013 PID Upgrade
  151. April 5, 2023, FCAL Insert Installation Meeting
  152. April 6, 2022 FCAL 2 Design Meeting
  153. April 6, 2023
  154. April 8, 2022 Tech group SAD meeting
  155. April 8-14
  156. Assmbly Hub for the CDC
  157. Attenuation Results from Radphi
  158. Aug 02,2020 Tech group meeting
  159. Aug 1, 2014 Design Meeting
  160. Aug 11, 2011 SiPM Electrical and Cooling
  161. Aug 14, 2011 Replacement Solenoid
  162. Aug 15, 2023 HallD AI/ML meeting
  163. Aug 16, 2011 Calorimetry
  164. Aug 16, 2011 SiPM Electrical and Cooling
  165. Aug 19, 2010 Calorimetry
  166. Aug 2, 2011 Calorimetry
  167. Aug 20, 2009 Calorimetry
  168. Aug 21, 2012 Readout
  169. Aug 22, 2023 HallD AI/ML meeting
  170. Aug 23, 2011 Readout
  171. Aug 23, 2011 SiPM Electrical and Cooling
  172. Aug 25, 2011 SiPM Electrical and Cooling
  173. Aug 27, 2009 Readout
  174. Aug 29, 2014 Design Meeting
  175. Aug 30, 2011 Calorimetry
  176. Aug 30, 2011 Readout
  177. Aug 30, 2011 SiPM Electrical and Cooling
  178. Aug 30, 2014 Design Meeting
  179. Aug 30, 2023 HallD AI/ML meeting
  180. Aug 31, 2023 HallD AI/ML meeting
  181. Aug 4, 2011 SiPM Electrical and Cooling
  182. Aug 6,2013 Readout
  183. Aug 8, 2023 HallD AI/ML meeting
  184. Aug 9, 2011 Readout
  185. Aug 9, 2011 SiPM Electrical and Cooling
  186. August 09, 2022 FCAL Insert Installation Meeting
  187. August 1, 2012 Tracking CDC/FDC
  188. August 10, 2006
  189. August 10, 2009 Tracking CDC/FDC
  190. August 10, 2012 Design Meeting
  191. August 10, 2015
  192. August 10, 2022 FCAL Insert Installation Meeting
  193. August 10, 2023
  194. August 11, 2022
  195. August 12, 2010 CDC Meeting
  196. August 12, 2010 Des/Fab Meeting
  197. August 12, 2011 Design Meeting
  198. August 12, 2013, Physics Working Group
  199. August 12, 2022 Tech group meeting
  200. August 14, 2006 Software
  201. August 14, 2013 tracking CDC/FDC
  202. August 15, 2012 traccking CDC/FDC
  203. August 15, 2019 FCAL Insert Design Meeting
  204. August 16, 2010 (11AM), Physics Working Group
  205. August 17, 2006
  206. August 17, 2009 (11AM), Physics Working Group
  207. August 17, 2010 Tracking CDC/FDC
  208. August 17, 2011 Tracking CDC/FDC
  209. August 17, 2012 Fab Meeting
  210. August 17, 2023
  211. August 18, 2022
  212. August 19, 2010 Des/Fab Meeting
  213. August 19, 2021 KLONG Design Meeting
  214. August 2, 2010 (11AM), Physics Working Group
  215. August 20, 2012 PID Upgrade
  216. August 23, 2013 PID Upgrade
  217. August 24, 2009 Tracking CDC/FDC
  218. August 24, 2012 Design Meeting
  219. August 24, 2023
  220. August 25, 2008 Tracking CDC/FDC
  221. August 25, 2022
  222. August 26, 2010 Des/Fab Meeting
  223. August 26, 2013, Physics Working Group
  224. August 26, 2021 CPP Design Meeting
  225. August 27, 2012 (11:30AM), Physics Working Group
  226. August 28, 2006 Software
  227. August 28, 2013 tracking CDC/FDC
  228. August 29, 2011 (11:30AM), Physics Working Group
  229. August 29, 2012 traccking CDC/FDC
  230. August 29, 2012 tracking CDC/FDC
  231. August 29, 2022 FCAL Insert Installation Meeting
  232. August 3, 2009 (11AM), Physics Working Group
  233. August 3, 2011 Tracking CDC/FDC
  234. August 3, 2022 DIRC analysis
  235. August 3, 2023
  236. August 30, 2010 (11AM), Physics Working Group
  237. August 30, 2023 Calorimeter
  238. August 31, 2009 (11AM), Physics Working Group
  239. August 31, 2011 Tracking CDC/FDC
  240. August 31, 2023
  241. August 4, 2022
  242. August 5, 2011 Design/Fab Meeting
  243. August 5, 2022 Tech group meeting
  244. August 7, 2006 Software
  245. August 8, 2014
  246. August 9, 2010 CDC Meeting
  247. August 9, 2013 PID Upgrade
  248. Automated Timing Calibrations
  249. Available EventStore skims
  250. B1pi monitoring dashboard schema
  251. B1pi tests Sep. 2011
  252. BCAL-Chiller.MPOD Interlock.jpg
  253. BCAL Action Items and Working Tasks
  254. BCAL Angular Coverage
  255. BCAL Beam Test Plots, November 20, 2006
  256. BCAL Calibration
  257. BCAL Cell Cross Talk
  258. BCAL Costhe Efficiency
  259. BCAL Gain Calibration
  260. BCAL Hybrid Module Cosmic Tests
  261. BCAL Installation
  262. BCAL Installation Schedule
  263. BCAL Key Documents
  264. BCAL LED Installation Photos
  265. BCAL Monitoring
  266. BCAL Pb Sheet Widths
  267. BCAL Preparations for spring 2016
  268. BCAL Readout Review
  269. BCAL Readout Segmentation Task group Meeting: Aug 12, 2011
  270. BCAL Readout Segmentation Task group Meeting: Aug 19, 2011
  271. BCAL Readout Segmentation Task group Meeting: Aug 5, 2011
  272. BCAL Readout Segmentation Task group Meeting: Jul 22, 2011
  273. BCAL Readout Segmentation Task group Meeting: Jun 23, 2011
  274. BCAL Readout Segmentation Task group Meeting: Jun 30, 2011
  275. BCAL Readout Segmentation Task group Meeting: Jun 9, 2011
  276. BCAL Readout Segmentation Task group Meeting: May 19, 2011
  277. BCAL Readout Segmentation Task group Meeting: May 26, 2011
  278. BCAL Readout Segmentation Task group Meeting: Nov. 14, 2011
  279. BCAL Readout Segmentation Task group Meeting: Nov. 21, 2011
  280. BCAL Readout Segmentation Task group Meeting: Nov. 28, 2011
  281. BCAL Readout Segmentation Task group Meeting: Oct. 10, 2011
  282. BCAL Readout Segmentation Task group Meeting: Oct. 3, 2011
  283. BCAL Readout Segmentation Task group Meeting: Sep 19, 2011
  284. BCAL Readout Segmentation Task group Meeting: Sep 2, 2011
  285. BCAL Readout Segmentation Task group Meeting: Sep 26, 2011
  286. BCAL Reconstruction Algorithms
  287. BCAL Reconstruction Issues
  288. BCAL Reconstruction Status Update 20130501
  289. BCAL Reconstruction Task list
  290. BCAL Stand-Alone Monte Carlo - energy resolution
  291. BCAL Startup Checkout List 2014
  292. BCAL TDC Timing
  293. BCAL calibration links, 2020, PrimEx, SRC
  294. BCAL cosmics
  295. BCAL hadronic efficiencies
  296. BCAL reconstruction 01/16/2012
  297. BCAL reconstruction 03/07/2013
  298. BCAL reconstruction 10/19/11
  299. BCAL reconstruction 11/28/11
  300. BCAL reconstruction 8/24/11
  301. BCAL reconstruction 9/21/11
  302. BCAL reconstruction test with pi0
  303. BCal Beam Test Plots, April 10, 2007
  304. BCal Beam Test Plots, April 4, 2007
  305. BCal Beam Test Plots, August 28, 2007
  306. BCal Beam Test Plots, December 15, 2006
  307. BCal Beam Test Plots, December 19, 2006
  308. BCal Beam Test Plots, March 8, 2007
  309. BCal Beam Test Plots, May 8, 2007
  310. BCal Raw ADC Plots, June 18, 2007
  311. BCal Timing Resolution Note
  312. BLTWG Meeting 01/19/2015
  313. BLTWG Meeting 01/21/2013
  314. BLTWG Meeting 10/11/2007
  315. BLTWG Meeting 11/16/2007
  316. BLTWG Meeting 11/29/2007
  317. BLTWG Meeting 11/8/2007
  318. BLTWG Meeting 12/20/2007
  319. BLTWG Meeting 4/17/2008
  320. BLTWG Meeting 4/3/2008
  321. BLTWG Meeting 5/1/2008
  322. BLTWG Meeting 5/29/2008
  323. BLTWG Meeting 9/13/2007
  324. BLTWG Meeting 9/27/2007
  325. Baby BCAL at JLab
  326. Baby BCAL at JLab Photos
  327. Background studies
  328. Bar box darkening procedure
  329. Barrel Calorimeter
  330. Basic formalism for X-ray monochromator resolution
  331. Bcal Action Item Tracker
  332. Beam-induced background
  333. Beam-induced backgrounds
  334. Beam Data
  335. Beam Test Analyses and Results
  336. Beam Test Meeting Mon. Apr. 02, 2012
  337. Beam Test Meeting Mon. Apr. 09, 2012
  338. Beam Test Meeting Mon. Apr. 16, 2012
  339. Beam Test Meeting Mon. Apr. 23, 2012
  340. Beam Test Meeting Mon. Apr. 30, 2012
  341. Beam Test Meeting Mon. Mar. 19, 2012
  342. Beam Test Meeting Mon. Mar. 26, 2012
  343. Beam Test Meeting Mon. May. 07, 2012
  344. Beam Test Shift Schedule
  345. Beam commissioning: Fall 2014
  346. Beam commissioning in Fall 2014
  347. Beam halo measurements to assess background for PRad target TAC runs.
  348. Beam request (expect to run in 2021)
  349. Beam request (run in 2021)
  350. Beni's PMT replacement email
  351. Bggen-2017-01-ver03
  352. Bggen-2017-01-ver03.6
  353. Bggen-2018-01-ver02.2 bggen
  354. Bggen-2018-01-ver02 bggen
  355. Bggen-2018-08-ver02.2 bggen
  356. Bggen-2018-08-ver02 bggen
  357. Bill's to do list
  358. Blake CAP08 Abstract
  359. Bleed-through tests from other hall bunches
  360. BoardAgenda201001
  361. BoardAgenda201005
  362. BoardAgenda201009
  363. BoardAgenda201102
  364. BoardAgenda201105
  365. BoardAgenda201110
  366. BoardAgenda201202
  367. BoardAgenda201205
  368. BoardAgenda201210
  369. BoardAgenda201302
  370. BoardAgenda201306
  371. BoardAgenda201310
  372. BoardAgenda201402
  373. BoardAgenda201610
  374. BoardAgenda201702
  375. BoardAgenda201705
  376. BoardAgenda201710
  377. BoardAgenda201809
  378. BoardAgenda201905
  379. Brief Report on Yianna's ADC fits for SensL SiPMs
  380. Build on Github Pull Request
  381. Building HDDM support software
  382. Building Private Versions of GlueX Software: my halld build jlab
  383. Building a roof over src
  384. C++11 in Hall D Online
  385. CAEN V792N ADC
  386. CBAR Splitoff Software
  387. CB member who changes institutions
  388. CCAL preparation
  389. CCDB 0.09
  390. CCDB 1.00
  391. CCDB Author List Maintenance
  392. CCDB Example Session
  393. CCDB Schema Changes in Version 1.00
  394. CCDB Tables BCAL
  395. CCDB Tables CDC
  396. CCDB Tables FCAL
  397. CCDB Tables FDC
  398. CCDB Tables Photon Beam
  399. CCDB Tables Start Counter
  400. CCDB Tables TOF
  401. CCDB Wishlist
  402. CD3 geometry forward-region material effects
  403. CDC/FDC ASIC Discussion Meeting, September 3, 2008
  404. CDC/FDC Gas System GUI
  405. CDC 06 02 2008
  406. CDC 14 11 2007
  407. CDC 20 02 2008
  408. CDC 216 channels
  409. CDC 21 05 2008
  410. CDC 21 11 2007
  411. CDC 23 01 2008
  412. CDC 28 11 2007
  413. CDC 50/50 premix
  414. CDC 50 50
  415. CDC 55 45
  416. CDC 60 40
  417. CDC B field
  418. CDC Construction Complications Tracking
  419. CDC Electrical Hook Up Photos
  420. CDC Future MC Studies Discussion, October 1, 2008
  421. CDC HVB version 3
  422. CDC HV scan
  423. CDC HV scan instructions October 2021
  424. CDC High Voltage Board (HVB)
  425. CDC NIM Elton
  426. CDC Pedestal Studies
  427. CDC Photos 2008
  428. CDC Readiness Checklist
  429. CDC Straw Sag photos
  430. CDC alcohol
  431. CDC amp dedx
  432. CDC and FDC readout tests
  433. CDC bad channels
  434. CDC channel numbers
  435. CDC commissioning plan
  436. CDC events
  437. CDC finding signal duration
  438. CDC garfield calcs
  439. CDC garfield drift vs gas mix
  440. CDC garfield xt table comparison
  441. CDC geometry April09
  442. CDC max drift times from Garfield
  443. CDC more garfield calcs
  444. CDC odd events
  445. CDC old & new preamp noise scope trace study
  446. CDC old preamp then and now
  447. CDC peak lengths
  448. CDC preamp LV checkup
  449. CDC prototype drift times
  450. CDC prototype fADC data
  451. CDC prototype flowrates
  452. CDC prototype more on timing
  453. CDC prototype more on timing 2
  454. CDC prototype more on timing 3
  455. CDC prototype runs at CMU
  456. CDC prototype tilted
  457. CDC q vs n
  458. CDC readout requirements
  459. CDC recent run drift times
  460. CDC run 1282 noise
  461. CDC run 1603 strawless ch
  462. CDC run 2016 drift time fits
  463. CDC run 2055
  464. CDC run 2551
  465. CDC run 2551 drift time fits
  466. CDC run 970
  467. CDC run 985
  468. CDC straight straws
  469. CDC straw number index
  470. CDC threshold scan procedure
  471. CDC tilted detectors
  472. CDC tilted detectors summary
  473. CDC time spikes
  474. CDC track angles (range of theta)
  475. CDC tracked and untracked cosmics
  476. CDC tracked and untracked cosmics 1950
  477. CDC tracked cosmics
  478. CDC transfer func attempt
  479. CDC wiggle wire positions
  480. CERNLIB Installation
  481. CFD Diff
  482. CFD Fifth - 90"
  483. CFD First - 50"
  484. CFD Fourth - 70"
  485. CFD Left
  486. CFD Right
  487. CFD Second - 10"
  488. CFD Sum
  489. CFD Third - 30"
  490. CHESS X-ray measurements 5/2009
  491. CHESS X-ray measurements 5/2011
  492. CLARA and Service Oriented Architectures
  493. CMU - Naomi's secondary event readout file
  494. CMU - fADC125
  495. CMU CLEAN ROOM
  496. CMU Data Challenge 2
  497. CMsgRootConsumer.cc
  498. CMsgRootMakefile
  499. CMsgRootProducer.cc
  500. CODA include file distribution problem

View (previous 500 | next 500) (20 | 50 | 100 | 250 | 500)