File list
From GlueXWiki
This special page shows all uploaded files.
First page |
Previous page |
Next page |
Last page |
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
17:56, 24 June 2013 | Fcal monitoring planes jun20.pdf (file) | 380 KB | Proposed dimensions for plexiglass panes used for Fcal monitoring system | 1 | |
14:31, 20 November 2007 | Fiber loss.pdf (file) | 157 KB | Alex's digitization of fiber spectra and analysis | 1 | |
18:49, 20 December 2007 | Full view trig5.gif (file) | 7 KB | 1 | ||
15:19, 22 July 2011 | Geom dt jul22.pdf (file) | 101 KB | Toy MC studies | 1 | |
13:02, 4 December 2020 | Gevorkyan PRC80(2009)055201.pdf (file) | 495 KB | Photoproduction of pi0 for PRIMEX | 1 | |
11:52, 22 January 2013 | Gluing1.JPG (file) | 756 KB | Front face of module 45 | 1 | |
13:39, 6 February 2013 | Gluing10.JPG (file) | 837 KB | Wand on module ready to push light guides into position | 1 | |
13:41, 6 February 2013 | Gluing11.JPG (file) | 674 KB | Use of height gauge to verify length of light guides | 1 | |
11:53, 22 January 2013 | Gluing2.JPG (file) | 832 KB | Front face without flash module 45 | 1 | |
11:55, 22 January 2013 | Gluing4.JPG (file) | 819 KB | All columns glued on to module 45. | 1 | |
18:03, 22 January 2013 | Gluing5.JPG (file) | 856 KB | Downstream end of module 45 with 2 columns glued. Shown is the monitoring string secured with Kapton tape | 1 | |
13:34, 6 February 2013 | Gluing6.JPG (file) | 649 KB | Bobby and Tina preparing to glue | 1 | |
13:36, 6 February 2013 | Gluing7.JPG (file) | 680 KB | Light guides ready on wand | 1 | |
13:37, 6 February 2013 | Gluing8.JPG (file) | 732 KB | Transfer of guides with wand onto module | 1 | |
13:38, 6 February 2013 | Gluing9.JPG (file) | 805 KB | Cleaning up after two columns glued onto module | 1 | |
08:43, 7 April 2011 | Guides testing Apr6.pdf (file) | 7 KB | Test setup for crude measurement of guide transmission | 2 | |
07:54, 23 June 2021 | Hackathon.png (file) | 3.25 MB | hackathon preview | 1 | |
16:49, 13 September 2011 | HallB-runschedule.pdf (file) | 26 KB | Hall B tentative run schedule fall 2011, spring 2012 | 1 | |
17:39, 15 November 2012 | HallB beamtest periods.pdf (file) | 100 KB | Beam current in nA as a function of time for the BCAL beam test in Hall B 2012. | 1 | |
16:02, 23 May 2012 | HallB chiller.JPG (file) | 874 KB | Hall B, mini-Bcal chiller | 2 | |
08:35, 3 May 2012 | HallB miniBcal 20degBack.JPG (file) | 714 KB | mini-Bcal in Hall B. Position: 20 deg incident beam. Back side. | 1 | |
08:32, 3 May 2012 | HallB miniBcal 20degFront.JPG (file) | 707 KB | mini-Bcal in Hall B. Position at 20 deg incidence angle to beam. Front Side | 1 | |
15:59, 23 May 2012 | HallB miniBcal 5degview1.JPG (file) | 682 KB | Hall B mini-Bcal 35% location, 5deg, view 1 | 1 | |
16:01, 23 May 2012 | HallB miniBcal 5degview2.JPG (file) | 692 KB | Hall B mini-Bcal 35% location, 5deg, view 2 | 1 | |
08:29, 3 May 2012 | HallB miniBcal normal.JPG (file) | 665 KB | mini-Bcal in Hall B. Positioned at normal incidence to beam. | 1 | |
16:05, 23 May 2012 | HallB tagger area.JPG (file) | 689 KB | Hall B, area under tagger. Fcal prototype at 22% point and mini-Bcal at 35% point | 1 | |
09:05, 13 January 2021 | HallD CPP-NPP charge.pdf (file) | 84 KB | Hall D CPP-NPP Charge for ERR | 1 | |
13:57, 24 May 2021 | HallD CPP NPP ERR response2.pdf (file) | 133 KB | Hall D CPP-NPP ERR Response 2 to questions | 1 | |
17:42, 28 January 2014 | HallD Target Table.pdf (file) | 48 KB | Hall D target parameters from Chris Keith as of Jan 18, 2014 | 1 | |
15:00, 10 July 2014 | HallD beam delivery proc 1b8.pdf (file) | 230 KB | Draft Hall D beam delivery procedure for accelerator. DRAFT July 10, 2014 | 1 | |
08:24, 28 February 2007 | Halldlayout.pdf (file) | 0 B | Elevation and plan view of the detector | 1 | |
14:01, 3 April 2009 | Hamamatsu pages.pdf (file) | 565 KB | Photomultiplier tube -- principle to operation, p. 178-180 | 1 | |
15:20, 6 October 2008 | Handling SCSF-78fibers.pdf (file) | 84 KB | Suggestions for handling Kuraray fibers | 1 | |
12:02, 8 November 2011 | IMG 0793.JPG (file) | 2.18 MB | Athens monitoring 2 | 1 | |
11:59, 8 November 2011 | IMG 0794.JPG (file) | 1.87 MB | Athens monitoring 1 | 1 | |
09:57, 1 April 2020 | Instructions for jeopardy PAC.pdf (file) | 122 KB | Instructions_for_jeopardy_PAC.pdf | 1 | |
13:38, 25 March 2009 | JLab atten mar25.png (file) | 85 KB | Summary of attenuation length measurements for the first article Kuraray SCSF-78M fibers | 1 | |
13:40, 25 March 2009 | JLab npe mar25.png (file) | 68 KB | Summary of measurement of number of photoelectrons for 90Sr source for first article Kuraray SCSF-78M fibers. | 1 | |
07:30, 22 May 2020 | Justin email 5-13.png (file) | 330 KB | Comments from Justin regarding NPP/CPP proposals | 1 | |
18:39, 7 March 2012 | L1010002.JPG (file) | 942 KB | Closeup of first string of monitoring boards on Bcal | 1 | |
18:37, 7 March 2012 | L1010003.JPG (file) | 887 KB | replaced wrong file | 2 | |
13:44, 15 August 2012 | LED glue1.JPG (file) | 636 KB | Jig for LED gluing / side view | 1 | |
13:45, 15 August 2012 | LED glue2.JPG (file) | 641 KB | Jig for LED gluing / side view perspective | 1 | |
13:46, 15 August 2012 | LED glue3.JPG (file) | 541 KB | Jig for LED gluing / cards with residue glue after gluing and removal | 2 | |
10:56, 31 July 2012 | LED light1.JPG (file) | 694 KB | LED light far side, flashing column | 1 | |
10:57, 31 July 2012 | LED light2.JPG (file) | 677 KB | LED light, adjacent to flashing column | 2 | |
11:24, 1 August 2012 | LED light3.JPG (file) | 729 KB | LED flashing, same column opposite end of mini-Bcal | 1 | |
08:17, 24 July 2012 | LED monitoring outsideview.JPG (file) | 673 KB | LEDs on support. Up side faces away from light guide and hole. | 1 | |
07:55, 24 May 2011 | LED study-2 v1-1.pdf (file) | 436 KB | LED_study-2_v1-1.pdf | 1 | |
14:09, 22 August 2019 | LOI12-19-003 TAC THY.pdf (file) | 137 KB | LOI12-19-003 TAC Theory comments | 1 |
First page |
Previous page |
Next page |
Last page |