File list
From GlueXWiki
This special page shows all uploaded files.
First page |
Previous page |
Next page |
Last page |
Date | Name | Thumbnail | Size | Description | Versions |
---|---|---|---|---|---|
07:39, 13 June 2019 | CPP sketches.pdf (file) | 7.22 MB | Dimensions of the forward cart and racks behind FCAL | 1 | |
10:49, 17 January 2020 | NPP update jan20.pdf (file) | 5.43 MB | NPP update for Jan 17, 2020 meeting. | 1 | |
12:14, 8 January 2020 | CPP update jan20.pdf (file) | 3.74 MB | DIRC geometry | 1 | |
07:54, 23 June 2021 | Hackathon.png (file) | 3.25 MB | hackathon preview | 1 | |
09:46, 10 April 2020 | NPP update apr10.pdf (file) | 3.11 MB | NPP_update_apr10.pdf | 1 | |
08:10, 11 June 2020 | D00000-00-00-1019 REV-.pdf (file) | 2.89 MB | DIRC installation drawings | 1 | |
18:05, 23 September 2022 | CPP target frame mockup.png (file) | 2.57 MB | CPP Target frame with mockup for holder of actual target | 1 | |
10:50, 12 April 2023 | CCDB constants CPP.png (file) | 2.38 MB | Status of constants in CCDB for CTOF and FMWPC | 1 | |
13:10, 2 September 2015 | 20150902 MWPC.pdf (file) | 2.33 MB | pi polarizability MWPC update Sep 2 | 1 | |
12:02, 8 November 2011 | IMG 0793.JPG (file) | 2.18 MB | Athens monitoring 2 | 1 | |
13:05, 17 October 2017 | 2017-10-17 MWPC move.pdf (file) | 2.07 MB | Preparations for moving MWPC prototype to JLab | 1 | |
18:05, 19 November 2020 | Coarse Acc Schedule 2021.pdf (file) | 2.03 MB | Coarse_Acc_Schedule_2021.pdf | 1 | |
08:24, 3 December 2014 | Meet141203.pdf (file) | 1.89 MB | Summary from Andrei on threshold and calibration from cosmic-ray runs | 2 | |
11:59, 8 November 2011 | IMG 0794.JPG (file) | 1.87 MB | Athens monitoring 1 | 1 | |
10:33, 7 February 2020 | NOTES-JOSE Feb7 2020.pdf (file) | 1.84 MB | 1 | ||
08:56, 21 February 2020 | NOTES-JOSE Feb21 2020.pdf (file) | 1.81 MB | NOTES-JOSE_Feb21_2020 for Pi0 Polarizability meeting | 1 | |
12:33, 17 January 2020 | NOTES-JOSE jan17.pdf (file) | 1.79 MB | Notes from Jose, Jan 17, 2020 | 1 | |
12:50, 19 December 2019 | NOTES-JOSE Dec19 2019.pdf (file) | 1.7 MB | Jose's notes Dec 19, 2019 | 1 | |
10:54, 30 April 2013 | Read transmission mod47 mod10.pdf (file) | 1.63 MB | Transmission tests of module 47 and 10 | 1 | |
09:58, 9 October 2019 | Oct9-2.png (file) | 1.61 MB | 1 | ||
11:31, 22 April 2022 | Target2.png (file) | 1.59 MB | CPP and NPP target holder. Two positions, A and B, are available for full Pb208 and empty. | 1 | |
09:58, 9 October 2019 | Oct9-3.png (file) | 1.58 MB | 1 | ||
10:40, 6 December 2019 | NOTES-JOSE.pdf (file) | 1.54 MB | NOTES-JOSE_12-6-2019 | 1 | |
09:39, 18 September 2019 | TOF pics2 sep18 2019.png (file) | 1.5 MB | TOF pics 2 during enlarging center hole. Sep 18, 2019 | 1 | |
14:06, 22 August 2019 | Pi0 Polarizability-7.pdf (file) | 1.47 MB | LOI submitted to PAC47 | 1 | |
16:23, 12 March 2020 | Screen Shot 2020-03-12 at 4.22.53 PM.png (file) | 1.47 MB | g Pb -> pi0 pi0 Pb cross section under various assumptions (Ilya) | 1 | |
21:39, 5 March 2012 | Bcal wrapping test.pdf (file) | 1.44 MB | Test of wrapping materials for Bcal light guides | 1 | |
09:57, 9 October 2019 | Oct9-1.png (file) | 1.44 MB | 1 | ||
08:04, 11 December 2018 | Pion backgrounds in CPP.pdf (file) | 1.23 MB | Rory: presentation at Dec 7 CPP meeting | 1 | |
09:39, 18 September 2019 | TOF pics1 sep18 2019.png (file) | 1.22 MB | TOF pics 1 during enlarging center hole. Sep 18, 2019 | 1 | |
08:01, 26 October 2016 | Perkins p276-279.pdf (file) | 1.12 MB | Pages from Perkins book p 276-279 (early edition 1970) | 1 | |
10:54, 10 August 2017 | Draft NIM slides.pdf (file) | 1.1 MB | DRAFT performance slides for BCAL NIM paper | 1 | |
13:21, 31 May 2011 | TLG production status 30052011.pdf (file) | 1,022 KB | Light production status at USM | 1 | |
10:54, 9 June 2017 | CPP jun9.pdf (file) | 963 KB | angle definitions in helicity frame. CCP meeting June 9, 2017 | 1 | |
18:39, 7 March 2012 | L1010002.JPG (file) | 942 KB | Closeup of first string of monitoring boards on Bcal | 1 | |
16:47, 11 March 2012 | C1010003.JPG (file) | 904 KB | Light through full complement of light guides on one side, iPhone light shinning through the middle guides. | 1 | |
18:37, 7 March 2012 | L1010003.JPG (file) | 887 KB | replaced wrong file | 2 | |
16:02, 23 May 2012 | HallB chiller.JPG (file) | 874 KB | Hall B, mini-Bcal chiller | 2 | |
09:43, 15 May 2015 | CPP update FCAL.pdf (file) | 866 KB | First look at energies in the FCAL | 1 | |
18:03, 22 January 2013 | Gluing5.JPG (file) | 856 KB | Downstream end of module 45 with 2 columns glued. Shown is the monitoring string secured with Kapton tape | 1 | |
10:32, 30 April 2009 | BCAL readout1.pdf (file) | 845 KB | draft considerations for Bcal readout | 1 | |
10:05, 21 March 2018 | 2018-3-21.jpg (file) | 843 KB | slides for today's meeting | 1 | |
11:28, 21 March 2018 | Rory 2018-3-21.pdf (file) | 843 KB | update on 3-21-2018 | 1 | |
13:39, 6 February 2013 | Gluing10.JPG (file) | 837 KB | Wand on module ready to push light guides into position | 1 | |
11:53, 22 January 2013 | Gluing2.JPG (file) | 832 KB | Front face without flash module 45 | 1 | |
10:11, 12 March 2013 | Cage3.JPG (file) | 830 KB | Right side of cage on end of BCAL module | 1 | |
12:00, 21 March 2012 | A1010004.JPG (file) | 829 KB | Bcal electronics/cooling package: Side view | 1 | |
11:55, 22 January 2013 | Gluing4.JPG (file) | 819 KB | All columns glued on to module 45. | 1 | |
08:12, 24 July 2012 | BCAL monitoring LEDs.JPG (file) | 817 KB | End view of light guide showing LEDs in holes | 1 | |
17:47, 20 February 2012 | USM FA 2.JPG (file) | 807 KB | USM first article light guide / first look | 1 |
First page |
Previous page |
Next page |
Last page |