All public logs
From GlueXWiki
Combined display of all available logs of GlueXWiki. You can narrow down the view by selecting a log type, the username (case-sensitive), or the affected page (also case-sensitive).
(newest | oldest) View (newer 50 | older 50) (20 | 50 | 100 | 250 | 500)- 15:01, 10 July 2020 Elton (Talk | contribs) uploaded File:SiPM assignments.png (Assignment of individual SiPM arrays and HV channels)
- 09:38, 9 July 2020 Elton (Talk | contribs) moved page Pi0 Polarizability Meeting Jun 19, 2020 to Pi0 Polarizability Meeting Jul 10, 2020 (new date)
- 16:40, 17 June 2020 Elton (Talk | contribs) moved page Feedback from Barry / Tue Apr 14 to Feedback from Barry Ritchie/ Tue Apr 14 (add last name)
- 08:10, 11 June 2020 Elton (Talk | contribs) uploaded File:D00000-00-00-1019 REV-.pdf (DIRC installation drawings)
- 07:19, 29 May 2020 Elton (Talk | contribs) uploaded File:Reinhard email.png (Followup on NPP proposal review)
- 07:30, 22 May 2020 Elton (Talk | contribs) uploaded File:Justin email 5-13.png (Comments from Justin regarding NPP/CPP proposals)
- 09:51, 24 April 2020 Elton (Talk | contribs) uploaded File:Screen Shot 2020-04-24 at 9.50.49 AM.png (Table outline for NPP backgrounds)
- 11:29, 15 April 2020 Elton (Talk | contribs) moved page Feedback from Barry / Tue Apr 24 to Feedback from Barry / Tue Apr 14 (typo in date)
- 09:46, 10 April 2020 Elton (Talk | contribs) uploaded File:NPP update apr10.pdf (NPP_update_apr10.pdf)
- 11:14, 3 April 2020 Elton (Talk | contribs) uploaded File:Non-flip amplitude.png (Jose's notepad)
- 09:59, 1 April 2020 Elton (Talk | contribs) uploaded File:BH sensitivity to form factors.pdf (BH_sensitivity_to_form_factors.pdf)
- 09:57, 1 April 2020 Elton (Talk | contribs) uploaded File:Instructions for jeopardy PAC.pdf (Instructions_for_jeopardy_PAC.pdf)
- 16:23, 12 March 2020 Elton (Talk | contribs) uploaded File:Screen Shot 2020-03-12 at 4.22.53 PM.png (g Pb -> pi0 pi0 Pb cross section under various assumptions (Ilya))
- 08:56, 21 February 2020 Elton (Talk | contribs) uploaded File:NOTES-JOSE Feb21 2020.pdf (NOTES-JOSE_Feb21_2020 for Pi0 Polarizability meeting)
- 10:33, 7 February 2020 Elton (Talk | contribs) uploaded File:NOTES-JOSE Feb7 2020.pdf
- 12:33, 17 January 2020 Elton (Talk | contribs) uploaded File:NOTES-JOSE jan17.pdf (Notes from Jose, Jan 17, 2020)
- 10:49, 17 January 2020 Elton (Talk | contribs) uploaded File:NPP update jan20.pdf (NPP update for Jan 17, 2020 meeting.)
- 18:58, 16 January 2020 Elton (Talk | contribs) uploaded File:Twopi primakoff DSelect test W 100000.pdf (Output of simple amplitude fit to 2pi0 generation. Checking output from LOI but using geant4)
- 18:57, 16 January 2020 Elton (Talk | contribs) uploaded File:DSelector Z2pi0 trees test flat 100000.pdf (DSelector output for 2pi0 Primakoff production, reproducing LOI results for flat and geant4)
- 18:56, 16 January 2020 Elton (Talk | contribs) uploaded File:DSelector Z2pi0 trees test signal 100000.pdf (Output of DSelector for 2pi0 Primakoff production. Reproducing results from LOI but using geant4)
- 12:14, 8 January 2020 Elton (Talk | contribs) uploaded File:CPP update jan20.pdf (DIRC geometry)
- 12:50, 19 December 2019 Elton (Talk | contribs) uploaded File:NOTES-JOSE Dec19 2019.pdf (Jose's notes Dec 19, 2019)
- 10:40, 6 December 2019 Elton (Talk | contribs) uploaded File:NOTES-JOSE.pdf (NOTES-JOSE_12-6-2019)
- 15:31, 15 November 2019 Elton (Talk | contribs) uploaded File:NOTES-JOSE Nov15 2019.pdf (NOTES-JOSE_Nov15_2019)
- 09:58, 9 October 2019 Elton (Talk | contribs) uploaded File:Oct9-4.png
- 09:58, 9 October 2019 Elton (Talk | contribs) uploaded File:Oct9-3.png
- 09:58, 9 October 2019 Elton (Talk | contribs) uploaded File:Oct9-2.png
- 09:57, 9 October 2019 Elton (Talk | contribs) uploaded File:Oct9-1.png
- 14:08, 26 September 2019 Elton (Talk | contribs) uploaded File:CPP configuration.png (Table I from NPP proposal, experiment configuration for CPP)
- 09:39, 18 September 2019 Elton (Talk | contribs) uploaded File:TOF pics2 sep18 2019.png (TOF pics 2 during enlarging center hole. Sep 18, 2019)
- 09:39, 18 September 2019 Elton (Talk | contribs) uploaded File:TOF pics1 sep18 2019.png (TOF pics 1 during enlarging center hole. Sep 18, 2019)
- 14:22, 13 September 2019 Elton (Talk | contribs) uploaded File:PionPolarizabilities-Theory-1.pdf (Theory priority list by Jose)
- 07:17, 13 September 2019 Elton (Talk | contribs) uploaded File:PionPolarizabilities-Theory.pdf (Outline of Pi0 polarizability issues for discussion at Sep 13 meeting.)
- 14:11, 22 August 2019 Elton (Talk | contribs) uploaded File:EltonMark emailto SteveDytman.png (Mail from Elton and Mark to Steve Dytman, LOI reviewer for PAC 47)
- 14:09, 22 August 2019 Elton (Talk | contribs) uploaded File:LOI12-19-003 TAC THY.pdf (LOI12-19-003 TAC Theory comments)
- 14:06, 22 August 2019 Elton (Talk | contribs) uploaded File:Pi0 Polarizability-7.pdf (LOI submitted to PAC47)
- 07:39, 13 June 2019 Elton (Talk | contribs) uploaded File:CPP sketches.pdf (Dimensions of the forward cart and racks behind FCAL)
- 07:42, 4 April 2019 Elton (Talk | contribs) uploaded File:Fall18 calib.pdf (Update from Karthik on the fall 18 calibration)
- 08:04, 11 December 2018 Elton (Talk | contribs) uploaded File:Pion backgrounds in CPP.pdf (Rory: presentation at Dec 7 CPP meeting)
- 10:08, 13 June 2018 Elton (Talk | contribs) uploaded File:2018-6-13.pdf (2018-6-13.pdf)
- 09:37, 6 June 2018 Elton (Talk | contribs) uploaded File:BGRateCalc.png (Example of BGRateCalc calculation for flux)
- 07:09, 18 May 2018 Elton (Talk | contribs) uploaded File:Bug correct.png (correct location of bug found)
- 07:08, 18 May 2018 Elton (Talk | contribs) uploaded a new version of File:Workfest summary elton.png (Reverted to version as of 10:53, 18 May 2018)
- 07:07, 18 May 2018 Elton (Talk | contribs) uploaded a new version of File:Workfest summary elton.png (Reverted to version as of 18:09, 17 May 2018)
- 06:53, 18 May 2018 Elton (Talk | contribs) uploaded a new version of File:Workfest summary elton.png (Corrected where bug was found)
- 14:09, 17 May 2018 Elton (Talk | contribs) uploaded File:Workfest summary elton.png (Workfest summary of item 4 from validation team.)
- 11:28, 21 March 2018 Elton (Talk | contribs) uploaded File:Rory 2018-3-21.pdf (update on 3-21-2018)
- 10:05, 21 March 2018 Elton (Talk | contribs) uploaded File:2018-3-21.jpg (slides for today's meeting)
- 13:05, 17 October 2017 Elton (Talk | contribs) uploaded File:2017-10-17 MWPC move.pdf (Preparations for moving MWPC prototype to JLab)
- 16:29, 19 September 2017 Elton (Talk | contribs) uploaded File:MWPC sketch.pdf (Sketches of MWPC including dimensions prepared by Ilya)