Most linked-to pages
From GlueXWiki
Showing below up to 250 results in range #1 to #250.
View (previous 250 | next 250) (20 | 50 | 100 | 250 | 500)
- Connect to the Data Challenge Meetings (870 links)
- Tagged Beam Group Biweekly Meetings (325 links)
- Long term items (114 links)
- Private:MOU Status (86 links)
- Private:Construction (78 links)
- Short term CALWG Items (76 links)
- Calibration Dashboard (75 links)
- SRC FCAL time/energy calibrations (71 links)
- Video Conferencing Alternatives (70 links)
- BCAL Reconstruction Issues (65 links)
- PrimEx-eta phase1 FCAL energy calibration (65 links)
- PrimEx-eta phase2 FCAL energy calibration (65 links)
- CPP and NPP Readiness Review (64 links)
- Testing of PMT dividers (64 links)
- File:FCAL LED PrimeX.pdf (63 links)
- BCAL Reconstruction Algorithms (60 links)
- Analysis Overview (60 links)
- OWG Meeting 2-Oct-2017 (51 links)
- User:Marki (48 links)
- BCAL calibration links, 2020, PrimEx, SRC (47 links)
- BCAL Action Items and Working Tasks (47 links)
- CPP FCAL time/energy calibrations (45 links)
- CDC algo (44 links)
- GlueX phase 2, 2023-01 data set (43 links)
- PrimEx-eta phase3 FCAL time/energy calibrations (43 links)
- Action Items From Hall-D Software Meetings (42 links)
- Calibration Train (41 links)
- CPP and NPP Experiment Configuration (40 links)
- 2012 Software Review (40 links)
- Sep 21, 2017 Calorimeter (37 links)
- CDC readout requirements (36 links)
- Analysis Studies (34 links)
- Mcsmear updates (34 links)
- CDC garfield calcs (34 links)
- Solenoid Controls Redesign (34 links)
- Spring 2019 DIRC Commissioning (33 links)
- Solenoid Coil Test (32 links)
- Run Coordination Meetings:Fall2017 Spring2018 Run (32 links)
- BCAL Beam Tests 2012 (31 links)
- File:FADC125 dataformat 250 modes.docx (31 links)
- File:FADC250 modes 2.docx (31 links)
- Spring 2016 Recon Checklist (30 links)
- Analysis Studies Fall2016 (30 links)
- Analysis Studies Spring2017 (30 links)
- File:FADC250 V2 ADC FPGA V90D.docx (29 links)
- PrimEx-eta phase 3 (2022-08) BCAL pi0 calibration (29 links)
- Offline Monitoring Data Validation (29 links)
- 2013 Software Review (27 links)
- GlueX Offline FAQ (25 links)
- SiPM Radiation Hardness Test (24 links)
- GlueX-Collaboration-Oct-2014 (23 links)
- Sim1 Conditions (23 links)
- Spring 2015 Commissioning Simulations (22 links)
- Run Coordination Meetings:Fall2022 (22 links)
- Private:Instructions for the TDR (22 links)
- 2017 mcsmear Workplan (22 links)
- Monitoring R&D (22 links)
- GlueX-Collaboration-May-2014 (21 links)
- GlueX/Hall-D Installation Meetings (21 links)
- GlueX-Collaboration-Feb-2013 (21 links)
- OWG Meeting 11-Jan-2017 (20 links)
- GlueX Level-3 Trigger Meeting, Jul 22, 2016 (20 links)
- GlueX-Collaboration-May-2017 (20 links)
- Short term items (20 links)
- Mcsmear 20160323 (20 links)
- GlueX-Collaboration-Feb-2016 (19 links)
- Beam Simulations (19 links)
- Time-of-Flight/Start-Counter Action Items (19 links)
- Π polarizability Software Meeting May 5, 2022 (19 links)
- DIRC Review Meeting (19 links)
- Addressing ERR review recommendations (18 links)
- Run Coordination Meetings:Summer2022 (18 links)
- CDC run 985 (17 links)
- User talk:Marki (17 links)
- GlueX-Collaboration-Jun-2013 (17 links)
- GlueX-Collaboration-Feb-2014 (17 links)
- September 2, 2014 (17 links)
- CDC run 970 (17 links)
- CPP Design Meetings (17 links)
- GlueX TOF Meeting, May 4, 2022 (17 links)
- Run Coordination Meetings: Spring 2016 Run (16 links)
- GlueX-Collaboration-Oct-2012 (16 links)
- Level-3 Trigger (16 links)
- GlueX-Collaboration-Feb-2015 (16 links)
- GlueX-Collaboration-May-2015 (15 links)
- Beam Test Software (15 links)
- GlueX-Collaboration-May-2016 (15 links)
- GlueX-Collaboration-Oct-2013 (15 links)
- GlueX-Collaboration-Oct-2015 (15 links)
- GlueX PID Meeting, May 16, 2023 (15 links)
- 2012 Offline Computing Schedule (15 links)
- Private:Papers Under Review (15 links)
- Online Major Milestones (14 links)
- Fall 2014 Commissioning Simulations (14 links)
- Beam Test Run Plan (14 links)
- Electronics (14 links)
- Solenoid Current Studies (14 links)
- Calibration Challenge (14 links)
- TOF DAQ Tasks, January 22, 2015 (14 links)
- Conferences (14 links)
- Test Setup for SiPMs (14 links)
- DAQ Tasks for Spring 2015 Commissioning Run (14 links)
- BLTWG Meeting 03/29/2023 (14 links)
- Trigger Working Group Meetings (14 links)
- CPP and NPP Run Conditions (14 links)
- GlueX-Collaboration-Feb-2017 (13 links)
- GlueX Communications (13 links)
- Fall 2019 DIRC Commissioning (13 links)
- Getting started with GlueX Software (13 links)
- GlueX-Collaboration-Feb-2012 (13 links)
- Physics Analysis (13 links)
- Software Review 4 (13 links)
- DIRC Planning for FY16 (13 links)
- RunPeriod-2017-01 Validation (13 links)
- 2011 Hall B FCAL Beam Test (13 links)
- August 29, 2014 PID Upgrade (13 links)
- GlueX-Collaboration-Oct-2016 (13 links)
- Beam Test Hardware (12 links)
- GlueX-Collaboration-May-2010 (12 links)
- GlueX-Collaboration-Jan-2011 (12 links)
- GlueX-Collaboration-Sep-2011 (12 links)
- Calibration and Monitoring System Meetings (12 links)
- GlueX-Collaboration-June-2018 (12 links)
- GlueX Bluejeans Video Conferencing (12 links)
- Using the Grid (11 links)
- GlueX PAC 2010 (11 links)
- Online Projects (11 links)
- GlueX Offline Software (11 links)
- Topics for the 2015 Software Review (11 links)
- Software Review 3 (11 links)
- GlueX-Collaboration-Jun-2012 (11 links)
- Run Coordination Meetings:Fall2018 Run (11 links)
- FA125 Data Format July 7, 2015 (11 links)
- Data Challenge 3 (11 links)
- Remote Access Instructions for Collaboration Meeting, January 28-30, 2010 (11 links)
- Beam Test Cabling (10 links)
- GlueX-Collaboration-Oct-2019 (10 links)
- PAC Proposals (10 links)
- Sim-Recon Tagged Releases (10 links)
- Run Coordination Meetings:Spring2019 Run (10 links)
- Offline Software (10 links)
- GlueX-Collaboration-Feb-2018 (10 links)
- GlueX-Collaboration-Sept-2008 (10 links)
- GlueX Start Counter Meeting, March 31, 2022 (10 links)
- GlueX Physics (10 links)
- GlueX Analysis Workshop 2013 (10 links)
- GlueX-Collaboration-May-2019 (10 links)
- Coding Conventions (10 links)
- File:FADC125 DataFormat v5 06.pdf (9 links)
- GlueX-II and DIRC ERR (9 links)
- For the third coil (9 links)
- Magnetic Field Maps for Solenoid (9 links)
- SQLite-form of the CCDB database (9 links)
- May 27, 2010 Calorimetry (9 links)
- Sep 2, 2008 Calorimetry (9 links)
- Sim-RP-2017-01-ver01 Conditions (9 links)
- Meeting-5-9-2019 (9 links)
- Readiness Review: Testing of light sensors for Bcal (9 links)
- GlueX-Collaboration-Sep-2009 (9 links)
- Run Coordination Meetings:Summer2020 (9 links)
- Private:Fiber Specs (9 links)
- GlueX-Collaboration-Feb-2020 (9 links)
- GlueX Physics Workshop 2016 (9 links)
- Online Action Items (9 links)
- 2017-01 recon ver02 plans (9 links)
- Data Challenge 2: Ideas (9 links)
- Start Counter Simulations (9 links)
- BCAL (9 links)
- Data Monitoring Procedures (9 links)
- Commissioning Calibration Data (9 links)
- FA125 Data Format Sep 22, 2015 (8 links)
- Run Table (8 links)
- January 3, 2014 Installation (8 links)
- 2015 October 14 DIRC Project Review (8 links)
- Meetings (8 links)
- GlueX Start Counter Meeting, December 8, 2022 (8 links)
- GlueX-Collaboration-May-2011 (8 links)
- Reconstruction References (8 links)
- Automatic Tests of GlueX Software (8 links)
- Photon Beam (8 links)
- RunPeriod-2017-01 Reconstruction (8 links)
- Level-3 Trigger Meetings (8 links)
- Summer 2013 Manpower Contributions (8 links)
- Oct 15, 2008 Calorimetry (8 links)
- Analysis Launch Plugin Requirements (8 links)
- GlueX TOF Meeting, March 8, 2016 (8 links)
- Meeting-2-7-2019 (8 links)
- GlueX-Collaboration-Sep-2010 (8 links)
- Remote shift concepts (8 links)
- High Intensity Running (8 links)
- Detailed plan for testing production SiPM units (8 links)
- Nightly Builds of GlueX Software (8 links)
- FDC (8 links)
- File:FA125 format v5 01.pdf (8 links)
- Checking the FCAL gains (8 links)
- Sim-RP-2017-01-ver02 Conditions (8 links)
- GlueX Start Counter Meeting, June 29, 2017 (8 links)
- Software and Computing Review 6 (8 links)
- Run Coordination Meetings: Fall 2015 Run (7 links)
- Calorimetry F250 Firmware (7 links)
- Background Rate Studies (7 links)
- GlueX Offline Meeting, December 1, 2009 (7 links)
- Photon Beam Design Requirements (7 links)
- Beam Test Trigger and electronics (7 links)
- All modules (with SICCAS crystals) are removed (7 links)
- Papers Under Review (7 links)
- Tagger Magnetic Field Mapping (7 links)
- File:FA125 format v5 03.pdf (7 links)
- GlueX Start Counter Meeting, March 8, 2018 (7 links)
- GlueX Start Counter Meeting, March 24, 2016 (7 links)
- GlueX Physics Lattice QCD Calculations (7 links)
- June 10, 2014 (7 links)
- Conversion from Subversion to Git (7 links)
- Tagger Magnetic Field Mapping Analysis (7 links)
- OWG Meeting 24-Nov-2010 (7 links)
- Run Coordination Meetings: Spring 2017 Run (7 links)
- CPP Test 2020 - Schedule (7 links)
- Calibration Database (7 links)
- GlueX Physics Photoproduction (7 links)
- Posters (7 links)
- First look at TOF calibration (7 links)
- GlueX Phase III Planning (7 links)
- Simple Email Lists (7 links)
- August 13, 2014 Calibration (7 links)
- May 2008 Subsystem Review (7 links)
- Run Coordination Meetings:Summer2021 (7 links)
- FA125 Update January 28, 2016 (7 links)
- GlueX Physics Review Papers (7 links)
- Π polarizability Meeting Nov 9, 2016 (7 links)
- Action Items From Hall D Offline Meetings (7 links)
- Private:Service Statements (7 links)
- OWG Meeting 21-Sep-2016 (7 links)
- October 7, 2009 Software (7 links)
- Spring 2016 Trigger Summary (7 links)
- GlueX Physics Strong Decay Models (7 links)
- GlueX-Collaboration-Sep-2018 (7 links)
- GlueX Target Meeting, July 12, 2011 (7 links)
- Instrumentation Publications (7 links)
- GlueX TOF Meeting, July 11, 2017 (7 links)
- Beam Commissioning Plan (7 links)
- RF Calibration (7 links)
- HallD Online IP Name And Address Conventions (7 links)
- Meeting-11-30-2017 (6 links)
- Calibration-Monitoring (6 links)
- GlueX Publication Policies (6 links)
- Minutes-12-15-2016 (6 links)
- HOWTO use a pre-built release (6 links)
- GlueX-Collaboration-Jan-2009 (6 links)
- GlueX-Collaboration-May-2022 (6 links)
- November 2, 2012 PID Upgrade (6 links)