Spring 2019 DIRC Commissioning

From GlueXWiki
Revision as of 09:53, 28 June 2018 by Jrsteven (Talk | contribs) (Commissioning Milestones)

Jump to: navigation, search


Commissioning Goals

  • Integrate DIRC readout with general Hall D DAQ and online/offline monitoring
  • Calibrate per-pixel timing offset of MAPMTs using LED system
  • Determine geometric alignment parameters (position and angle offsets) for optical components
  • Implement reconstruction algorithm and compare data/MC: # detected photons, Cherenkov angle resolution

Commissioning Tasks and Milestones

  • TBD

Simulation studies for commissioning

Requirements

  • Final geometry in CCDB with appropriate run number
  • Define JANA calibration variation for CCDB specific to DIRC(?)
  • LUT algorithm implemented as factor in DIRC sim-recon library

Data Samples

  • bggen sample (1M events) for comparison of rates and occupancies with data
  • single track pion and kaon samples in kinematic bins for comparison with data