Start Counter Operations

From GlueXWiki
Revision as of 10:25, 15 September 2023 by Zihlmann (Talk | contribs) (Start Counter Operations)

Jump to: navigation, search

Start Counter Operations

Performance studies of the start counter over time

  • Detector response as a function of z location over time. The z-bin starts with 60cm and each bin covers 2cm so bin 2 is 62-64 cm and bin 17 is 84-86 cm. As an example paddle 3 bin 7 and bin 15 are compared between run 41835 and run 90660. It is clear that in the nose section (bin 15) the response is much larger (meaning more photons reach the SiPM)
    Sc adcresponse matchedHits R41835 and R90660 paddle3 NoseSection 7.gif Sc adcresponse matchedHits R41835 and R90660 paddle3 NoseSection 15.gif
    • Run 51260
      Sc paddle response run51260.gif
    • Run 71560
      Sc paddle response run71560.gif
      mean adc response and width ratio for different z bins 1, 5, 10, 15
      Sc runperiod70k 1.gif Sc runperiod70k 5.gif Sc runperiod70k 10.gif Sc runperiod70k 15.gif
    • Run 81715
      Sc paddle response run81715.gif
    • Run 90660
      Sc paddle response run90660.gif
    • Run 111885
      Sc paddle response run111885.gif
    • Run 120848
      Sc paddle response run120848.gif