Steps for Offline Activities, 12 Gev Project

From GlueXWiki
Revision as of 13:44, 16 September 2009 by Marki (Talk | contribs) (copied from blog)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Integration of Slow Controls (5533020)

  • Design API for accessing items from expermental online database
  • Implement API
  • Integrate use of API into offline reconstruction code
  • Testing
  • Documentation

Track Finding (5533045)

  • prototype algorithm development
  • integration into analysis framework
  • design of final algorithm
  • implementation
  • testing
  • documentation

Track Fitting (5533050)

  • prototype algorithm development
  • integration into analysis framework
  • design of final algorithm
  • implementation
  • testing
  • documentation

Integration/QC (5533100)

  • design system for version management
  • design integration testing system
  • implement integration testing
  • design/implement component testing framework
  • documentation

Calibration (5533105)

  • choose software environment/utilities
  • design database structure
  • design API
  • design user interface
  • implement API/user interface
  • testing
  • documentation

PWA Development (5533160)

  • Install PWA system components locally
  • Test installation

PWA Challenge (5533165)

  • develop scope
  • choose appropriate platform
  • collect and assemble components
  • develop metrics and tools for evaluation
  • production

Documentation (5533180)

  • no step for this activity have been identified at this time