General logbook entries:

  • Lubomir's status on 9/1/2020: [1]

Straight-track data

  • For alignment of the GEM/TRD we need to acquire production samples with the magnetic field off
  • Straight-track sample at the center positions with the full GEM readout for tracking and alignment studies
    • Runs - taken with FCAL_TRACK_CENT20_m9_TRDm10 configuration
      • Logbook entries:

Full GEM readout: tracking mode

  • At least one large dataset at each of the 3 TRD positions will be required with the full readout for tracking and alignment studies with the full solenoid field