Summer 2020 TRD/GEM Commissioning

From GlueXWiki
Revision as of 15:33, 3 September 2020 by Jrsteven (Talk | contribs)

Jump to: navigation, search

General logbook entries:

  • Lubomir's status on 9/1/2020: [1]

Straight-track data

Full GEM readout: tracking mode

  • At least one large dataset will be required with the full readout for tracking and alignment studies with the full solenoid field
  • Runs 73011-73013 taken with FCAL_TRACK_CENT20_m9_TRDm10 configuration
  • Runs 73014-????? taken with FCAL_BCAL_PS_m9 configuration
    • runs at 150, 250 and 350 nA