TAGH PMT testing

From GlueXWiki
Revision as of 21:29, 29 September 2013 by Fklein (Talk | contribs) (Created page with "img:PSL_in_light_tight_box.png After PMT leads and cables have been soldered to PCBs: *Place assembled PMTs in light-tight box and connect cables *Verify that PMT, diffuse...")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

img:PSL_in_light_tight_box.png

After PMT leads and cables have been soldered to PCBs:

  • Place assembled PMTs in light-tight box and connect cables
  • Verify that PMT, diffuser & attenuator stand, and Picosecond Laser are aligned
  • Turn on HV and check monitored current, ramp up to 850 V
  • Turn on Picosecond Laser (intensity scale to 1.5, freq. to 100 kHz)
  • Check signals on oscilloscope, use measurement function to report min/max within the peak and integral
  • Ramp laser frequency to 1 MHz, 2 MHz, 5 MHz, 10 MHz
  • Repeat frequency scan for HV=900 V, 1000 V, 1100 V
  • Check for break-down voltage and frequency
  • Report results on excel sheet, save snapshots of scope signal