After LG&SC inspection and PMT HV tests:
- Glue LG&SC to PMT using Bill's fixture (glue: Momentive RTV615). Follow procedure D00000-19-01-P002
- Wrap LG with aluminized mylar and tedlar, attach the clamp collar using Bill's jig. Follow procedures D00000-19-01-P003, -P004
- Wrap mu-metal around the PMT. Follow procedure D00000-19-01-P005
- Wrap SC with aluminized mylar and non-transmittend masking tape. Follow procedure D00000-19-01-P006