Difference between revisions of "TAG counter assembly"

From GlueXWiki
Jump to: navigation, search
(Created page with "After LG&SC inspection and PMT HV tests: *Glue LG&SC to PMT using Bill's fixture (glue: Momentive RTV615). Follow procedure D00000-19-01-P002 *Wrap LG with aluminized mylar and t...")
(No difference)

Revision as of 18:15, 13 October 2013

After LG&SC inspection and PMT HV tests:

  • Glue LG&SC to PMT using Bill's fixture (glue: Momentive RTV615). Follow procedure D00000-19-01-P002
  • Wrap LG with aluminized mylar and tedlar, attach the clamp collar using Bill's jig. Follow procedures D00000-19-01-P003, -P004
  • Wrap mu-metal around the PMT. Follow procedure D00000-19-01-P005
  • Wrap SC with aluminized mylar and non-transmittend masking tape. Follow procedure D00000-19-01-P006

Media:TAGH_counter_assembly.xlsx spreadsheet