Difference between revisions of "TAG counter assembly"

From GlueXWiki
Jump to: navigation, search
(Created page with "After LG&SC inspection and PMT HV tests: *Glue LG&SC to PMT using Bill's fixture (glue: Momentive RTV615). Follow procedure D00000-19-01-P002 *Wrap LG with aluminized mylar and t...")
 
 
Line 5: Line 5:
 
*Wrap SC with aluminized mylar and non-transmittend masking tape. Follow procedure D00000-19-01-P006
 
*Wrap SC with aluminized mylar and non-transmittend masking tape. Follow procedure D00000-19-01-P006
  
[[Media:TAGH_counter_assembly.xlsx spreadsheet]]
+
[[Media:TAGH_counter_assembly.xlsx | Excel spreadsheet: Counter assembly]]

Latest revision as of 18:17, 13 October 2013

After LG&SC inspection and PMT HV tests:

  • Glue LG&SC to PMT using Bill's fixture (glue: Momentive RTV615). Follow procedure D00000-19-01-P002
  • Wrap LG with aluminized mylar and tedlar, attach the clamp collar using Bill's jig. Follow procedures D00000-19-01-P003, -P004
  • Wrap mu-metal around the PMT. Follow procedure D00000-19-01-P005
  • Wrap SC with aluminized mylar and non-transmittend masking tape. Follow procedure D00000-19-01-P006

Excel spreadsheet: Counter assembly