TAG counter assembly
From GlueXWiki
Revision as of 18:15, 13 October 2013 by Fklein (Talk | contribs) (Created page with "After LG&SC inspection and PMT HV tests: *Glue LG&SC to PMT using Bill's fixture (glue: Momentive RTV615). Follow procedure D00000-19-01-P002 *Wrap LG with aluminized mylar and t...")
After LG&SC inspection and PMT HV tests:
- Glue LG&SC to PMT using Bill's fixture (glue: Momentive RTV615). Follow procedure D00000-19-01-P002
- Wrap LG with aluminized mylar and tedlar, attach the clamp collar using Bill's jig. Follow procedures D00000-19-01-P003, -P004
- Wrap mu-metal around the PMT. Follow procedure D00000-19-01-P005
- Wrap SC with aluminized mylar and non-transmittend masking tape. Follow procedure D00000-19-01-P006