Difference between revisions of "TOF HV SCAN 2022"

From GlueXWiki
Jump to: navigation, search
 
Line 2: Line 2:
 
The TOF HV scan will follow the same procedure as the [[TOF HV SCAN FALL 2019 | 2019 scan]]
 
The TOF HV scan will follow the same procedure as the [[TOF HV SCAN FALL 2019 | 2019 scan]]
 
with the addition four more HV settings to better cover the full range and also a scan also the HV of the CTOF.
 
with the addition four more HV settings to better cover the full range and also a scan also the HV of the CTOF.
 +
 +
If the beam time is an issue one can consider going from a 25V step to a 50V step per HV setting.
 +
  
 
Those CTOF HVs  can be set in steps of 50V starting at 1800V all the way up to 2100V.
 
Those CTOF HVs  can be set in steps of 50V starting at 1800V all the way up to 2100V.

Latest revision as of 09:38, 9 June 2022

The TOF HV scan will follow the same procedure as the 2019 scan with the addition four more HV settings to better cover the full range and also a scan also the HV of the CTOF.

If the beam time is an issue one can consider going from a 25V step to a 50V step per HV setting.


Those CTOF HVs can be set in steps of 50V starting at 1800V all the way up to 2100V.