Difference between revisions of "TOF HV SCAN FALL 2019"

From GlueXWiki
Jump to: navigation, search
(Created page with "HV SCAN OF TOF PMTS * Beam conditions: 180nA e-beam on 3.10^4 Al radiator * start with 1150V for all PMTs * take data at each HV settings for about 20 files * HV steps: +/- 2...")
 
(HV SCAN OF TOF PMTS winter 2023)
 
(4 intermediate revisions by 2 users not shown)
Line 1: Line 1:
HV SCAN OF TOF PMTS
+
== HV SCAN OF TOF PMTS ==
  
 
* Beam conditions: 180nA e-beam on 3.10^4 Al radiator
 
* Beam conditions: 180nA e-beam on 3.10^4 Al radiator
Line 5: Line 5:
 
* take data at each HV settings for about 20 files
 
* take data at each HV settings for about 20 files
 
* HV steps: +/- 25V:
 
* HV steps: +/- 25V:
** HV = 1150, 1175, 1200, 1225, 1250, 1275, 1300
+
** HV = 1150, 1175, 1200, 1225, 1250, 1275, 1300 and new 1325, 1350
** HV = 1125, 1100, 1075
+
** HV = 1125, 1100, 1075, and new: 1050, 1025
 +
 
 +
After the scan return to nominal running conditions as follows:
 +
 
 +
On the TOF HV screen click save/restore.  This opens a small window.
 +
Click restore HV parameter setpoints.  This opens a larger window.
 +
Check that the file at the top of the list is selected, this ends with 1_Dec_2019_ALL1150V.snap
 +
Click Restore.
 +
 
 +
== HV SCAN OF TOF PMTS WINTER 2023 ==
 +
* Beam conditions: 150nA e-beam on 3.10^4 Al radiator: the rates in all PMts should be well below 1MHz.
 +
* start with 1150V for all PMTs
 +
** HV = 1150, 1100, 1050, 1200, 1250, 1300, 1350, 1400
 +
* take data at each HV settings for about 30 minutes
 +
* after scan restore HV settings to lates values of the database.

Latest revision as of 09:51, 13 January 2023

HV SCAN OF TOF PMTS

  • Beam conditions: 180nA e-beam on 3.10^4 Al radiator
  • start with 1150V for all PMTs
  • take data at each HV settings for about 20 files
  • HV steps: +/- 25V:
    • HV = 1150, 1175, 1200, 1225, 1250, 1275, 1300 and new 1325, 1350
    • HV = 1125, 1100, 1075, and new: 1050, 1025

After the scan return to nominal running conditions as follows:

On the TOF HV screen click save/restore. This opens a small window. Click restore HV parameter setpoints. This opens a larger window. Check that the file at the top of the list is selected, this ends with 1_Dec_2019_ALL1150V.snap Click Restore.

HV SCAN OF TOF PMTS WINTER 2023

  • Beam conditions: 150nA e-beam on 3.10^4 Al radiator: the rates in all PMts should be well below 1MHz.
  • start with 1150V for all PMTs
    • HV = 1150, 1100, 1050, 1200, 1250, 1300, 1350, 1400
  • take data at each HV settings for about 30 minutes
  • after scan restore HV settings to lates values of the database.