* [http://www.jlab.org/~whitey/TAGGER/Tagger_interfaceD00000-19-00-3001_SHT1.pdf Tagger magnet critical interfaces sht 1 FEB 23, 2009]
 
* [http://www.jlab.org/~whitey/TAGGER/Tagger_interfaceD00000-19-00-3001_SHT1.pdf Tagger magnet critical interfaces sht 1 FEB 23, 2009]
 
* [http://www.jlab.org/~whitey/Hall_D/TAGGER/QP_mag_sht1.pdf Tagger hall Quad magnet sht 1]
 
* [http://www.jlab.org/~whitey/Hall_D/TAGGER/QP_mag_sht1.pdf Tagger hall Quad magnet sht 1]
 +
* [http://www.jlab.org/~whitey/Hall_D/TAGGER/QP_mag_sht2.pdf Tagger hall Quad magnet sht 2]
 
==Broadband Tagger Hodoscope==
 
==Broadband Tagger Hodoscope==
 
* 35% drawings produced by Catholic Univ. ''(5/2007)''
 
* 35% drawings produced by Catholic Univ. ''(5/2007)''

Revision as of 14:38, 14 January 2010

Tagging Spectrometer

Broadband Tagger Hodoscope

  • 35% drawings produced by Catholic Univ. (5/2007)

Tagger Microscope

Active Collimator

  • 100% drawings produced by Univ. of Connecticut (6/2006)

Tagger Hall

  • Civil design produced by engineering firm for JLab (10/2007)

Collimator Cave

  • Conceptual design of shielding plan from Connecticut (5/2006)
  • Civil design produced by engineering firm for JLab (10/2007)

Collimator Cave Layout Aug 20, 2008 - Aug 20, 2008 Collimator Cave Isometric Jul 18, 2008 - July 18, 2008