Difference between revisions of "Tagged Beam Group Engineering Drawings"

From GlueXWiki
Jump to: navigation, search
(Collimator Cave)
(Tagging Spectrometer)
Line 11: Line 11:
 
* [http://www.jlab.org/~whitey/Hall_D/TAGGER/QP_mag_sht1.pdf Tagger hall Quad magnet sht 1]
 
* [http://www.jlab.org/~whitey/Hall_D/TAGGER/QP_mag_sht1.pdf Tagger hall Quad magnet sht 1]
 
* [http://www.jlab.org/~whitey/Hall_D/TAGGER/QP_mag_sht2.pdf Tagger hall Quad magnet sht 2]
 
* [http://www.jlab.org/~whitey/Hall_D/TAGGER/QP_mag_sht2.pdf Tagger hall Quad magnet sht 2]
 +
* [[Preliminary drawing by Yang]]
 +
* [[35% drawing by IHEP provided in April/May 2007]]
 +
** [[Private: Suggestion on changes to the 35% drawings]]
 +
* [[Statement of Work for the 100% engineering drawings]]
 +
** [[Private: Discussion of the Statement of Work]]
 +
* [[Media:TAGGERINTERface.pdf | Tagger interface drawing]]
 +
* [[Standard Beamline Quadrupole Specification]]
 +
* [[Media:Prelim_tagger_dwgs.pdf | Tagger Preliminary drawings 10May10]]
 +
* [[Media:Prelim_Hall-D_Tagger_Dipole_Magnet_Specification_4-30-2010.doc | Tagger magnet prelim spec May 2010]]
 +
 
==Broadband Tagger Hodoscope==
 
==Broadband Tagger Hodoscope==
 
* 35% drawings produced by Catholic Univ. ''(5/2007)''
 
* 35% drawings produced by Catholic Univ. ''(5/2007)''

Revision as of 14:27, 1 June 2010

Tagging Spectrometer

Broadband Tagger Hodoscope

  • 35% drawings produced by Catholic Univ. (5/2007)

Tagger Microscope

Active Collimator

  • 100% drawings produced by Univ. of Connecticut (6/2006)

Tagger Hall

  • Civil design produced by engineering firm for JLab (10/2007)

Collimator Cave