* Interface drawings produced at JLab ''(1/2008)''
 
* Interface drawings produced at JLab ''(1/2008)''
 
[http://www.jlab.org/~whitey/TAGGER/TAGGER_section1.pdf Tagger magnet and chamber section 1 July, 30, 2008] - ''July 30, 2008''
 
[http://www.jlab.org/~whitey/TAGGER/TAGGER_section1.pdf Tagger magnet and chamber section 1 July, 30, 2008] - ''July 30, 2008''
[http://www.jlab.org/~whitey/TAGGER/TAGGER_section2.pdf Tagger magnet and chamber section 2 July, 30, 2008] - ''July 30, 2008''
+
* [http://www.jlab.org/~whitey/TAGGER/TAGGER_section2.pdf Tagger magnet and chamber section 2 July, 30, 2008] - ''July 30, 2008''
 
* [http://www.jlab.org/~whitey/TAGGER/YANGNET.pdf Tagger magnet Cross section from Yang Tosca Sept 10, 2008]
 
* [http://www.jlab.org/~whitey/TAGGER/YANGNET.pdf Tagger magnet Cross section from Yang Tosca Sept 10, 2008]
  

Revision as of 15:57, 10 September 2008

Tagging Spectrometer

  • Conceptual drawings produced by the Glasgow group (ca. 2006)
  • 35% drawings produced by the IHEP group (5/2007)
  • Interface drawings produced at JLab (1/2008)

Tagger magnet and chamber section 1 July, 30, 2008 - July 30, 2008

Broadband Tagger Hodoscope

  • 35% drawings produced by Catholic Univ. (5/2007)

Tagger Microscope

Active Collimator

  • 100% drawings produced by Univ. of Connecticut (6/2006)

Tagger Hall

  • Civil design produced by engineering firm for JLab (10/2007)

Collimator Cave

  • Conceptual design of shielding plan from Connecticut (5/2006)
  • Civil design produced by engineering firm for JLab (10/2007)

Collimator Cave Layout Aug 20, 2008 - Aug 20, 2008 Collimator Cave Isometric Jul 18, 2008 - July 18, 2008