Difference between revisions of "Tagged Beam Group Engineering Drawings"

From GlueXWiki
Jump to: navigation, search
Line 6: Line 6:
 
* [http://www.jlab.org/~whitey/TAGGER/TAGGER_section2.pdf Tagger magnet and chamber section 2 July, 30, 2008] - ''July 30, 2008''
 
* [http://www.jlab.org/~whitey/TAGGER/TAGGER_section2.pdf Tagger magnet and chamber section 2 July, 30, 2008] - ''July 30, 2008''
 
* [http://www.jlab.org/~whitey/TAGGER/YANGNET.pdf Tagger magnet Cross section from Yang Tosca Sept 10, 2008]
 
* [http://www.jlab.org/~whitey/TAGGER/YANGNET.pdf Tagger magnet Cross section from Yang Tosca Sept 10, 2008]
* [http://www.jlab.org/~whitey/TAGGER/YANGNET PART DEUX.pdf Tagger magnet modified Cross section from Yang Tosca Sept 26, 2008]
+
* [http://www.jlab.org/~whitey/TAGGER/"YANGNET PART DEUX.pdf" Tagger magnet modified Cross section from Yang Tosca Sept 26, 2008]
* [http://www.jlab.org/~whitey/TAGGER/Tagger critical interface.pdf Tagger magnet critical interfaces Sept 29, 2008]
+
* [http://www.jlab.org/~whitey/TAGGER/"Tagger critical interface.pdf" Tagger magnet critical interfaces Sept 29, 2008]
 
==Broadband Tagger Hodoscope==
 
==Broadband Tagger Hodoscope==
 
* 35% drawings produced by Catholic Univ. ''(5/2007)''
 
* 35% drawings produced by Catholic Univ. ''(5/2007)''

Revision as of 13:43, 26 September 2008

Tagging Spectrometer

Broadband Tagger Hodoscope

  • 35% drawings produced by Catholic Univ. (5/2007)

Tagger Microscope

Active Collimator

  • 100% drawings produced by Univ. of Connecticut (6/2006)

Tagger Hall

  • Civil design produced by engineering firm for JLab (10/2007)

Collimator Cave

  • Conceptual design of shielding plan from Connecticut (5/2006)
  • Civil design produced by engineering firm for JLab (10/2007)

Collimator Cave Layout Aug 20, 2008 - Aug 20, 2008 Collimator Cave Isometric Jul 18, 2008 - July 18, 2008