* Conceptual design of shielding plan from Connecticut ''(5/2006)''
 
* Conceptual design of shielding plan from Connecticut ''(5/2006)''
 
* Civil design produced by engineering firm for JLab ''(10/2007)''
 
* Civil design produced by engineering firm for JLab ''(10/2007)''
 +
[http://www.jlab.org/~whitey/Collimator/Gluex_collimator_layout.pdf Collimator Cave Layout Jul 18, 2008] - ''July 18, 2008''

Revision as of 16:33, 18 July 2008

Tagging Spectrometer

  • Conceptual drawings produced by the Glasgow group (ca. 2006)
  • 35% drawings produced by the IHEP group (5/2007)
  • Interface drawings produced at JLab (1/2008)

Broadband Tagger Hodoscope

  • 35% drawings produced by Catholic Univ. (5/2007)

Tagger Microscope

  • 35% drawings produced by Univ. Connecticut (5/2007)

Active Collimator

  • 100% drawings produced by Univ. Connecticut (6/2006)

Tagger Hall

  • Civil design produced by engineering firm for JLab (10/2007)

Collimator Cave

  • Conceptual design of shielding plan from Connecticut (5/2006)
  • Civil design produced by engineering firm for JLab (10/2007)

Collimator Cave Layout Jul 18, 2008 - July 18, 2008