Difference between revisions of "Tagged Beam Group Engineering Drawings"

From GlueXWiki
Jump to: navigation, search
Line 20: Line 20:
 
* Civil design produced by engineering firm for JLab ''(10/2007)''
 
* Civil design produced by engineering firm for JLab ''(10/2007)''
 
[http://www.jlab.org/~whitey/Collimator/Gluex_collimator_layout.pdf Collimator Cave Layout Jul 18, 2008] - ''July 18, 2008''
 
[http://www.jlab.org/~whitey/Collimator/Gluex_collimator_layout.pdf Collimator Cave Layout Jul 18, 2008] - ''July 18, 2008''
 +
[http://www.jlab.org/~whitey/Collimator/Gluex_collimator_isometric.pdf Collimator Cave Isometric Jul 18, 2008] - ''July 18, 2008''

Revision as of 16:34, 18 July 2008

Tagging Spectrometer

  • Conceptual drawings produced by the Glasgow group (ca. 2006)
  • 35% drawings produced by the IHEP group (5/2007)
  • Interface drawings produced at JLab (1/2008)

Broadband Tagger Hodoscope

  • 35% drawings produced by Catholic Univ. (5/2007)

Tagger Microscope

  • 35% drawings produced by Univ. Connecticut (5/2007)

Active Collimator

  • 100% drawings produced by Univ. Connecticut (6/2006)

Tagger Hall

  • Civil design produced by engineering firm for JLab (10/2007)

Collimator Cave

  • Conceptual design of shielding plan from Connecticut (5/2006)
  • Civil design produced by engineering firm for JLab (10/2007)

Collimator Cave Layout Jul 18, 2008 - July 18, 2008 Collimator Cave Isometric Jul 18, 2008 - July 18, 2008