Line 3: Line 3:
 
* 35% drawings produced by the IHEP group ''(5/2007)''
 
* 35% drawings produced by the IHEP group ''(5/2007)''
 
* Interface drawings produced at JLab ''(1/2008)''
 
* Interface drawings produced at JLab ''(1/2008)''
 +
[http://www.jlab.org/~whitey/TAGGER/TAGGER_section1.pdf Tagger magnet and chamber section 1 July, 30, 2008] - ''July 30, 2008''
 +
[http://www.jlab.org/~whitey/TAGGER/TAGGER_section2.pdf Tagger magnet and chamber section 1 July, 30, 2008] - ''July 30, 2008''
  
 
==Broadband Tagger Hodoscope==
 
==Broadband Tagger Hodoscope==

Revision as of 10:52, 30 July 2008

Tagging Spectrometer

  • Conceptual drawings produced by the Glasgow group (ca. 2006)
  • 35% drawings produced by the IHEP group (5/2007)
  • Interface drawings produced at JLab (1/2008)

Tagger magnet and chamber section 1 July, 30, 2008 - July 30, 2008 Tagger magnet and chamber section 1 July, 30, 2008 - July 30, 2008

Broadband Tagger Hodoscope

  • 35% drawings produced by Catholic Univ. (5/2007)

Tagger Microscope

  • 35% drawings produced by Univ. Connecticut (5/2007)

Active Collimator

  • 100% drawings produced by Univ. Connecticut (6/2006)

Tagger Hall

  • Civil design produced by engineering firm for JLab (10/2007)

Collimator Cave

  • Conceptual design of shielding plan from Connecticut (5/2006)
  • Civil design produced by engineering firm for JLab (10/2007)

Collimator Cave Layout Jul 18, 2008 - July 18, 2008 Collimator Cave Isometric Jul 18, 2008 - July 18, 2008