Difference between revisions of "Tagged Beam Group Engineering Drawings"

From GlueXWiki
Jump to: navigation, search
m (Tagger Microscope)
(Active Collimator)
Line 13: Line 13:
  
 
==Active Collimator==
 
==Active Collimator==
* 100% drawings produced by Univ. Connecticut ''(6/2006)''
+
* 100% drawings produced by Univ. of Connecticut ''(6/2006)''
  
 
==Tagger Hall==
 
==Tagger Hall==

Revision as of 10:00, 4 September 2008

Tagging Spectrometer

  • Conceptual drawings produced by the Glasgow group (ca. 2006)
  • 35% drawings produced by the IHEP group (5/2007)
  • Interface drawings produced at JLab (1/2008)

Tagger magnet and chamber section 1 July, 30, 2008 - July 30, 2008 Tagger magnet and chamber section 2 July, 30, 2008 - July 30, 2008

Broadband Tagger Hodoscope

  • 35% drawings produced by Catholic Univ. (5/2007)

Tagger Microscope

Active Collimator

  • 100% drawings produced by Univ. of Connecticut (6/2006)

Tagger Hall

  • Civil design produced by engineering firm for JLab (10/2007)

Collimator Cave

  • Conceptual design of shielding plan from Connecticut (5/2006)
  • Civil design produced by engineering firm for JLab (10/2007)

Collimator Cave Layout Aug 20, 2008 - Aug 20, 2008 Collimator Cave Isometric Jul 18, 2008 - July 18, 2008