Tagged Beam Group Engineering Drawings

From GlueXWiki
Revision as of 13:45, 26 September 2008 by Whitey (Talk | contribs)

Jump to: navigation, search

Tagging Spectrometer

Broadband Tagger Hodoscope

  • 35% drawings produced by Catholic Univ. (5/2007)

Tagger Microscope

Active Collimator

  • 100% drawings produced by Univ. of Connecticut (6/2006)

Tagger Hall

  • Civil design produced by engineering firm for JLab (10/2007)

Collimator Cave

  • Conceptual design of shielding plan from Connecticut (5/2006)
  • Civil design produced by engineering firm for JLab (10/2007)

Collimator Cave Layout Aug 20, 2008 - Aug 20, 2008 Collimator Cave Isometric Jul 18, 2008 - July 18, 2008