Tagger and Beamline Review

From GlueXWiki
Revision as of 09:41, 17 December 2008 by Jstewart (Talk | contribs)

Jump to: navigation, search

The Hall D/GlueX Tagger and Beamline Review

Material Prepared for the Review

  • Pre-brief Material for the reviewers
  1. General Documents
  2. Tagging Spectrometer
  3. Electron Machine
  4. Fixed Hodoscope
  5. The microscope detector
  6. Pair Spectrometer
  7. Simulations of collimatior cave and pair spectrometer background- Alex
  8. Trigger rates and background - Alex

Relevant Wiki Pages

Dry Run Schedule for the Review

Connection Instructions:

  1. ESNET: join DOE ECS videoconferencing room 8542553.
  2. EVO: in community Gluex, look for "Photon Beam Review Dry Runs" meeting.
  3. Telephone: connect using the evo telephone bridge (for numbers, click here), with meeting Id's listed in parentheses below, and pass code 6626.

First round of dry runs (week of November 3rd)

Thursday, November 6, 2008 Room Elke's office and B101 after lunch (evo meeting id 614236)

Toll free: +1-800-377-8846 : US
+1-888-276-7715 : Canada
+1-302-709-8424 : International
participant code: 39527048#

Friday, November 7, 2008 Room F326/327 (evo meeting id 614247)

Monday, November 10, 2008 Room F326/327 (evo meeting id 614258)

Richard not available 12:00 - 14:00

Second round of dry runs (week of November 10)

Tuesday, November 11, 2008 Room F326/327 (evo meeting id 614269)

Wednesday, November 12, 2008 Room F326/327 (evo meeting id 614270)

Thursday, November 13, 2008 Room F326/327 (evo meeting id 614281)

Friday, November 14, 2008 Room F326/327 (evo meeting id 614292)

Main Review

  1. Review: November 19 and 20.
  2. issues that need special attention