Difference between revisions of "Tagger trigger timing"

From GlueXWiki
Jump to: navigation, search
Line 41: Line 41:
 
       <td valign="top">80 ns<br></td>
 
       <td valign="top">80 ns<br></td>
 
       <td valign="top">cable MOR to forward carriage<br></td>
 
       <td valign="top">cable MOR to forward carriage<br></td>
     <tr>
+
     </tr>
       <td valign="top">230 ns<br></td>
+
  <tr>
 +
      <td valign="top">50? ns<br></td>
 +
      <td valign="top">cable forward carriage to BCAL racks (not installed yet)<br></td>
 +
    </tr>
 +
  <tr>
 +
       <td valign="top">230 + 50 ns? <br></td>
 
       <td valign="top">total delay<br></td>
 
       <td valign="top">total delay<br></td>
 
     </tr>
 
     </tr>
Line 48: Line 53:
 
</table>
 
</table>
 
<br>
 
<br>
Note that the photon flight time from the radiator to the BCAL detector is about 100 ns, and that the RadPhi setup has 250 ns delay cables (straight, or 80+170 using a patch panel).<br>
+
Note that the photon flight time from the radiator to the BCAL detector is about 100 ns, and that the RadPhi setup has 250 ns delay cables (straight, or 80+170 using a patch panel).

Revision as of 16:43, 14 July 2006

Below is tagger trigger timing information I got from Eugene Pasyuk. Note that cables are trimmed so the sum of all delays is the same for all T-counters

</tr>
Delay
Location
25 ns
flight time tagger radiator to farthest T-counter
20 ns
in T-counter PMT
50 ns
cable to CFD
15 ns
internal CFD
5 ns
cable to L-R coincidence logic module
5 ns
internal L-R coincidence logic module
10 ns
cable to Master Or module
20 ns
internal MOR
80 ns
cable MOR to forward carriage
50? ns
cable forward carriage to BCAL racks (not installed yet)
230 + 50 ns?
total delay


Note that the photon flight time from the radiator to the BCAL detector is about 100 ns, and that the RadPhi setup has 250 ns delay cables (straight, or 80+170 using a patch panel).