Difference between revisions of "Testing High Granularity Hodoscope"

From GlueXWiki
Jump to: navigation, search
(Procedure)
(Test Data)
Line 18: Line 18:
  
 
===Test Data===
 
===Test Data===
 +
[[File:SiPM 3mm - PS-2015TestResult.xlsx]]
  
 
==Results==
 
==Results==

Revision as of 13:45, 17 June 2015

Procedure

Low Voltage/ Bias Control

In preparation for the tests, set-up the WIENER power supply (readout power and bias supplies) under computer control.
The readout supplies (channels 0 and 1 of the 8008L module) should be set to 5V and the bias supplies (channels 0 through 4 of the ISEG module)
should be set to the respective bias operating voltages from the SiPM channel chart.

Testing Silicon Photomultipliers

Layout

Figure 1. SiPM Layout

Test Data

File:SiPM 3mm - PS-2015TestResult.xlsx

Results