Difference between revisions of "Testing Page for Experiment Procedures for the Base Equipment in Hall"

From GlueXWiki
Jump to: navigation, search
Line 26: Line 26:
  
 
<td bgcolor="#e0e0f0" valign="top">
 
<td bgcolor="#e0e0f0" valign="top">
* Gas System Operation: Scot Spiegel/ Dave Butler
+
* Gas System Operation (Scot Spiegel/ Dave Butler)
 
* Insertion/removal of drift chambers FDC procedure exists but needs updating (Bill Crahen).  
 
* Insertion/removal of drift chambers FDC procedure exists but needs updating (Bill Crahen).  
 
* Insertion/removal CDC (Tim Whitlatch)
 
* Insertion/removal CDC (Tim Whitlatch)

Revision as of 07:54, 21 May 2014

Special Information:

Information for shift takers Procedures Documentation
  • Gas System Operation (Scot Spiegel/ Dave Butler)
  • Insertion/removal of drift chambers FDC procedure exists but needs updating (Bill Crahen).
  • Insertion/removal CDC (Tim Whitlatch)
  • Vacuum / damage to radiators/convertes (Tom Carstens)
  • Thin windows / Alcove and near photon beam dump (Tom Carstens)
  • Magnet power supplies. Existing documents sufficient supplemented by ESAD
  • Tagger/PS operation. Existing documents sufficient supplemented by ESAD
  • Solenoid, several procedures. Need to get a list of proceedures
  • Cryogenic target. Chris Keith will lead the OSP effort