Difference between revisions of "Testing Page for Experiment Procedures for the Base Equipment in Hall"

From GlueXWiki
Jump to: navigation, search
Line 1: Line 1:
 
<big>'''Special Information:'''</big><br>
 
<big>'''Special Information:'''</big><br>
 
<table cellpadding="3"><tr>
 
<table cellpadding="3"><tr>
<td width=250 bgcolor="#e0e0f0"> Information for shift takers </td>
+
<td width=150 bgcolor="#e0e0f0"> Detector operation for shifts </td>
<td width=250 bgcolor="#e0e0f0"> Approved procedures </td>
+
<td width=350 bgcolor="#e0e0f0"> Approved procedures </td>
 
<td width=250 bgcolor="#e0e0f0"> title 3</td>
 
<td width=250 bgcolor="#e0e0f0"> title 3</td>
 
</tr><tr>
 
</tr><tr>
Line 31: Line 31:
 
* Vacuum / damage to radiators/convertes (Tom Carstens)
 
* Vacuum / damage to radiators/convertes (Tom Carstens)
 
* Thin windows / Alcove and near photon beam dump (Tom Carstens)
 
* Thin windows / Alcove and near photon beam dump (Tom Carstens)
* Magnet power supplies. Existing documents sufficient supplemented by ESAD
+
* Magnet power supplies. Accelerator OSP?
* Tagger/PS operation. Existing documents sufficient supplemented by ESAD
+
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=32776 Hall D Tagger Magnet Mapping (ENP-13-32776-OSP)]
 +
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=36947  Hall D Pair Spectrometer Mapping (ENP-14-36947-OSP)]
 
* Solenoid, several procedures. Need to get a list of proceedures
 
* Solenoid, several procedures. Need to get a list of proceedures
 +
* [https://mis.jlab.org/mis/apps/mis_forms/operational_safety_procedure_form.cfm?entry_id=19709 Hall D Solenoid Magnet - Cryogenic Operations (ENG-12-19709-OSP)]
 
* Cryogenic target. Chris Keith will lead the OSP effort  
 
* Cryogenic target. Chris Keith will lead the OSP effort  
* [https://misportal.jlab.org/jlabDocs/document.seam?id=78791 D00000-01-06-P006 - Training for Work in the FCAL Dark Room]
+
* [https://misportal.jlab.org/jlabDocs/document.seam?id=78791 Training for Work in the FCAL Dark Room (D00000-01-06-P006)]
  
 
</td>
 
</td>

Revision as of 08:14, 21 May 2014

Special Information:

Detector operation for shifts Approved procedures title 3
  • Item 1
  • Item 2