Testing Page for Experiment Procedures for the Base Equipment in Hall

From GlueXWiki
Revision as of 07:53, 21 May 2014 by Elton (Talk | contribs)

Jump to: navigation, search

Special Information:

Information for shift takers Procedures Documentation
  • Gas System Operation: Scot Spiegel/ Dave Butler
  • Insertion/removal of drift chambers FDC procedure exists but needs updating (Bill Crahen).
  • Insertion/removal CDC (Tim Whitlatch)
  • Vacuum / damage to radiators/convertes (Tom Carstens)
  • Thin windows / Alcove and near photon beam dump (Tom Carstens)
  • Magnet power supplies. Existing documents sufficient supplemented by ESAD
  • Tagger/PS operation. Existing documents sufficient supplemented by ESAD
  • Solenoid, several procedures. Need to get a list of proceedures
  • Cryogenic target. Chris Keith will lead the OSP effort