Difference between revisions of "Testing of PMT dividers"

From GlueXWiki
Jump to: navigation, search
 
(20 intermediate revisions by the same user not shown)
Line 1: Line 1:
 +
''' New version of the active base'''
 +
<gallery>
 +
Image:new_base2.jpg  |  Fig. 1  Connectors on the new base
 +
Image:new_base3.jpg  |  Fig. 2  Connectors on the new base
 +
Image:new_base1.jpg  |  Fig. 3  Extension of the PCB to accommodate the new connector
 +
</gallery>
 +
 +
'''[[Final test of dividers]]'''
 +
 +
 
''' Bench tests'''
 
''' Bench tests'''
  
Line 8: Line 18:
 
</gallery>
 
</gallery>
  
[https://halldweb.jlab.org/wiki/index.php/Testing_of_PbWO_dividers Tests inside the FCAL dark room]
 
  
 +
[[Study noise inside FCAL]]
  
 +
 +
 +
 +
<span style="color:#FFFF00; background:#00C000">
 
''' Installing 5x5 prototype on CCAL '''
 
''' Installing 5x5 prototype on CCAL '''
 +
</span>
 +
 +
<gallery>
 +
Image:ccal_prototype2.jpg  |  Fig. 1 - Front view of the CCAL
 +
Image:ccal_prototype1.jpg  |  Fig. 2 - Rear view of the CCAL
 +
Image:ccal_prototype3.jpg  |  Fig. 3 - List of modules installe
 +
</gallery>
 +
 +
 +
''' Cables, and patch panels  '''
 +
 +
<gallery>
 +
Image:ccal_prot_cables1.jpg  |  Fig. 1 - Cables connected to the FCAL2 dividers (signal, HV, and LV)
 +
Image:ccal_prot_cables3.jpg  |  Fig. 2 - Cables connected to the FCAL2 dividers (signal, HV, and LV)
 +
Image:ccal_prot_cables2.jpg  |  Fig. 3 - Closer look of dividers
 +
Image:ccal_prot_cables4.jpg  |  Fig. 4 - Patch panels: LV distribution for the 5x5 prototype (right) 
 +
Image:ccal_prot_cables5.jpg  |  Fig. 5 - Patch panel from the outside of the CCAL (the MPOD connector is on the left)
 +
</gallery>
  
  
 +
'''Tuning dividers after the CCAL beam test '''
 
<gallery>
 
<gallery>
Image:ccal_prototype2.jpg  | Fig. 1 - Fig. 3 Installing modules on the CCAL prototype
+
Image:before_saturation_fern.png | Fig. 1 Original base before saturation
Image:ccal_prototype1.jpg  | Fig. 2  
+
Image:after_saturation_fern.png | Fig. 2 Original base, A = 1.8 V
Image:ccal_prototype3.jpg  | Fig. 3  
+
Image:new_ops.png | Fig. 3 Modified OPS
 
</gallery>
 
</gallery>

Latest revision as of 09:43, 19 October 2023

New version of the active base

Final test of dividers


Bench tests


Study noise inside FCAL



Installing 5x5 prototype on CCAL


Cables, and patch panels


Tuning dividers after the CCAL beam test