Difference between revisions of "Time-of-Flight"

From GlueXWiki
Jump to: navigation, search
(Operation in Hall-D)
(TOF Studies)
 
(9 intermediate revisions by 2 users not shown)
Line 8: Line 8:
 
* [[TOF_PID]]
 
* [[TOF_PID]]
 
* [[Magnetic Field in region of TOF]]
 
* [[Magnetic Field in region of TOF]]
 +
* [https://halldweb.jlab.org/detectors/tof/tofmap1.html TOF I Component Map]
 +
* [https://halldweb.jlab.org/detectors/tof/tofmap2.html TOF II Component Map]
  
 
=== TOF Construction ===
 
=== TOF Construction ===
Line 18: Line 20:
 
* [[Media:LightGuideMountConcept.pdf|Conceptual drawing of light guide and tube support from Ian Winger of FSU.]]
 
* [[Media:LightGuideMountConcept.pdf|Conceptual drawing of light guide and tube support from Ian Winger of FSU.]]
 
* Electrical schematic and mechanical drawings of Hamamatsu [[Media:H10534.pdf|H10534]] and [[Media:H10534MOD DWG 100514.pdf|H10534MOD]] phototube and base. [[Media:R10533 tentative data sheet (June 2009).pdf|Specifications for the R10533 PMT]] used in these packages.
 
* Electrical schematic and mechanical drawings of Hamamatsu [[Media:H10534.pdf|H10534]] and [[Media:H10534MOD DWG 100514.pdf|H10534MOD]] phototube and base. [[Media:R10533 tentative data sheet (June 2009).pdf|Specifications for the R10533 PMT]] used in these packages.
 +
* Specifications, voltage divider schematic, and mechanical drawings of Hamamatsu [[Media:H13795 Tentative Data Sheet 20171107.pdf|H13795]] phototube and base used in upgrade.
 
* 3D conceptual [[Media:Tof720.pptx|drawing of the time-of-flight (pptx)]] from Chuck Hutton as of July 20, 2011.
 
* 3D conceptual [[Media:Tof720.pptx|drawing of the time-of-flight (pptx)]] from Chuck Hutton as of July 20, 2011.
  
Line 55: Line 58:
 
** [[Media:TOF Mag shield data-mu metal plus steel.xlsx]]
 
** [[Media:TOF Mag shield data-mu metal plus steel.xlsx]]
 
*[[PMT rate tests]]
 
*[[PMT rate tests]]
 +
*[[TOF HV SCAN FALL 2019]]
 +
*[[TOF HV SCAN 2022]]
 +
*[[TOF Rates 2023]]
  
 
===Operation in Hall-D===
 
===Operation in Hall-D===
Line 63: Line 69:
 
*[[Running Spring 2017]]
 
*[[Running Spring 2017]]
 
*[[Calibration]]
 
*[[Calibration]]
 +
*[[Media:Gluex final survey Spring 2017.xlsx|Survey results, global coordinates for all major detector systems, Spring 2017 (Excel)]] (O:\halld_engineering\Alignment\Spring 2017)
  
 
===Organization===
 
===Organization===
  
* [[GlueX PID Biweekly Meetings|Meeting pages]]
+
* [[GlueX Time-of-Flight Bi-Weekly Meetings]]
 
* [[Time-of-Flight Construction Readiness Review|Readiness Review at FSU]]
 
* [[Time-of-Flight Construction Readiness Review|Readiness Review at FSU]]
 
* [[Time-of-Flight/Start-Counter Action Items|Action items]]
 
* [[Time-of-Flight/Start-Counter Action Items|Action items]]

Latest revision as of 12:55, 18 September 2023

The forward time-of-flight (TOF) detector is located right in front of the FCAL. It has two planes of scintillator paddles, in one plane the paddles are stacked vertically, in the other horizontally. Each paddle is 252cm long 6cm wide and 2.54cm thick. On both ends the paddles have "fish-tail" type light guides that couple to an XP2020 photo multiplier tube.

TOF Detector

The pupose of the TOF detector is to provide the means of particle identification (PID) through the measurement of the velocity of the particle passing through the detector volume. This velocity can be determined by measuring the time a particle needs for a given flight distance.

TOF Construction

Drawings

TOF light guide prototype

Timing Resolution

Electronics

Schedule and Contract

12 GeV Project schedule for TOF

TOF Studies

Operation in Hall-D

Organization