ToF non-linearity test
From GlueXWiki
Revision as of 09:39, 28 November 2017 by Deurpam (Talk | contribs) (Created page with "* The goal is to test the CAEN TDC in the TOF by taking data with the integral non linearity turned off for about 1 hour. * B. Zilmann will then will analyze the data (it ma...")
- The goal is to test the CAEN TDC in the TOF by taking data with the integral non linearity turned off for about 1 hour.
- B. Zilmann will then will analyze the data (it may take about 2 days) to determine new parameters that then will need
to be loaded onto the CAEN TDCs.
- Then the 1h run will be repeated with the integral non linearity correction turned on again.
- After this, the TDCs will be restored.
This will require some coordination with the DAQ experts, as the configuration for the TOF needs to be changed.