Difference between revisions of "Trigger/DAQ/Monitoring/Controls - Deprecated"

From GlueXWiki
Jump to: navigation, search
(Created page with "== Meetings and Other Important Information == * Agendas and Minutes * Controls * [[Trigger_Working_Group_Meetings|Trigger Workin...")
 
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/")
 
Line 4: Line 4:
 
* [[Trigger_Working_Group_Meetings|Trigger Working Group]]
 
* [[Trigger_Working_Group_Meetings|Trigger Working Group]]
 
* [[Counting House]]
 
* [[Counting House]]
* [http://halldweb1.jlab.org/mantisbt Mantis Task Tracker]
+
* [http://halldweb.jlab.org/mantisbt Mantis Task Tracker]
* [https://halldweb1.jlab.org/elog-halld Midas Elog System]
+
* [https://halldweb.jlab.org/elog-halld Midas Elog System]
* [https://halldweb1.jlab.org/JInventory/htdocs/list.php JInventory database]
+
* [https://halldweb.jlab.org/JInventory/htdocs/list.php JInventory database]
* [https://halldweb1.jlab.org/SP/HallD_Racks Hall D Rack Layouts]
+
* [https://halldweb.jlab.org/SP/HallD_Racks Hall D Rack Layouts]
 
* [[Translation Table]]
 
* [[Translation Table]]
 
* [http://www.jlab.org/Hall-D/test/TranslationTable Visual translation table broswer]
 
* [http://www.jlab.org/Hall-D/test/TranslationTable Visual translation table broswer]
Line 25: Line 25:
  
 
== Data Challenges ==
 
== Data Challenges ==
* [https://halldweb1.jlab.org/wiki/index.php/Online_Data_Challenge_2013 Online data challenge Aug 2013]
+
* [https://halldweb.jlab.org/wiki/index.php/Online_Data_Challenge_2013 Online data challenge Aug 2013]
* [https://halldweb1.jlab.org/wiki/index.php/Dec_Online_Data_Challenge_2013 Online data challenge Dec 2013] (expanded and revised into Spring 2014 Data Challenge, see below)
+
* [https://halldweb.jlab.org/wiki/index.php/Dec_Online_Data_Challenge_2013 Online data challenge Dec 2013] (expanded and revised into Spring 2014 Data Challenge, see below)
* [https://halldweb1.jlab.org/wiki/index.php/Spring_2014_Online_Data_Challenge Spring 2014 Online data challenge]
+
* [https://halldweb.jlab.org/wiki/index.php/Spring_2014_Online_Data_Challenge Spring 2014 Online data challenge]
  
  
Line 33: Line 33:
 
== Old Stuff ==
 
== Old Stuff ==
 
* [[Online Project List]]
 
* [[Online Project List]]
* [https://halldweb1.jlab.org/wiki/index.php/Online_task_list_for_2011 Online task list for 2011]
+
* [https://halldweb.jlab.org/wiki/index.php/Online_task_list_for_2011 Online task list for 2011]
 
<!--* [http://irmisvm.jlab.org:8080/IRMISComponents IRMIS]-->
 
<!--* [http://irmisvm.jlab.org:8080/IRMISComponents IRMIS]-->
 
* [[Online Action Items|Action Items from Online Meetings]]
 
* [[Online Action Items|Action Items from Online Meetings]]
Line 98: Line 98:
  
 
* Electronics channel counts, etc. maintained by Fernando, GlueX-doc-747 on the [http://portal.gluex.org GlueX portal]
 
* Electronics channel counts, etc. maintained by Fernando, GlueX-doc-747 on the [http://portal.gluex.org GlueX portal]
* Hall D JLab test [https://halldweb1.jlab.org/halldlog/ Electronic Logbook] (BCAL06, FCAL08, etc.)
+
* Hall D JLab test [https://halldweb.jlab.org/halldlog/ Electronic Logbook] (BCAL06, FCAL08, etc.)
 
* [http://www.jlab.org/Hall-D/controls/presentations/BNL_PLC_Selection.ppt BNL PLC evaluation]
 
* [http://www.jlab.org/Hall-D/controls/presentations/BNL_PLC_Selection.ppt BNL PLC evaluation]
 
* [[VME Controllers | Hall D VME Controllers]]
 
* [[VME Controllers | Hall D VME Controllers]]

Latest revision as of 22:22, 31 March 2015

Meetings and Other Important Information

Miscellaneous Information


Data Challenges


Old Stuff


Scope of Trigger/DAQ/Monitoring/Controls Effort

The responsibility of the Online Working Group (OWG) includes all aspects of running the experiment and taking data, as well as initial diagnosis of all problems that occur during data taking. Installation and repair of detector hardware is by necessity the responsibility of the individual detector groups. But control and monitoring of all detector hardware by shift personnel is the responsibility of the OWG.

Note that it is very important that every aspect of the experiment seen by shift personnel fall under the purview of the OWG. This is the only way to ensure that the operator environment is as simple and consistent as possible.

The OWG will review all controls software components developed by detector groups for compatibility with the overall control system. Such components may need to be modified to be compatible. Systems used only by experts need not be reviewed, although compatibility with the rest of the system is desirable. Similarly, controls hardware must be compatible with the overall experiment and slow controls systems. Every effort will be made to be as open to different types of hardware as possible.

OWG responsibilities include:

  • trigger hardware (with Electronics and Trigger groups)
  • trigger and front-end programming, configuration, and control* Revisit energy-sum trigger algorithm - Alex S - 29-Nov-2007
  • all aspects of data taking
  • L3 trigger and farm system (n.b. L3 algorithm will come from the Offline Working Group)
  • data transfer and storage on the silo
  • run management and control
  • online bookkeeping and electronic logbooks
  • all computers, networking, and telecom in the hall, tagger hall, and counting house
  • experiment and slow controls
  • alarm systems
  • archiving and display of controls data
  • event monitoring and display
  • counting house physical environment
  • etc.


Software HOWTO's

Online Design and Planning (kind of old)


Reviews


Misc Links (a bit old)


Online Subsystems


Other Groups Relevant to the Online Effort

  • Hall D Electronics Working Group
  • Hall D Offline Software Working Group
  • JLab DAQ Group
  • JLab Electronics Group
  • JLab Computer Center
  • JLab Accelerator Division