GlueX-doc-# | Title | Author(s) | Topic(s) | Last Updated |
---|---|---|---|---|
6730-v2 | FCAL2 mini ERR Cooling System Status | Timothy Whitlatch | Engineering |
13 Feb 2025 |
2545-v4 | HALL D WORKER SAFETY AWARENESS TRAINING (SAF113) | Mark Macrae Dalton et al. | Electrical Mechanical Engineering Infrastructure Reviews Design and Planning |
11 Jan 2023 |
4903-v2 | Engineering Design, Fabrication, Operation and Installation of CPP Hardware | Timothy Whitlatch | Project Status Installation Reviews Design and Planning |
10 Feb 2021 |
1852-v1 | Hall D solenoid install movie | Timothy Whitlatch | Magnet Alignment Design and Planning |
23 Jan 2019 |
3656-v1 | DIRC installation schedule and EHS&Q | Timothy Whitlatch | DIRC Engineering Reviews |
19 Jun 2018 |
2082-v2 | bcal status: mechanical, beam tests, cosmics & simulations | Fernando J. Barbosa et al. | Readout Photodetectors BCAL |
08 Oct 2012 |
Number of documents found: 6
DocDB Version 8.8.6, contact
Document Database Administrators
Execution time: 1 wallclock secs ( 0.37 usr + 0.08 sys = 0.45 CPU)