  1. Goal: Commission the trigger Collect data for calibration and characterization of the detector.
  2. Responsibility: HallD
  • Expected Schedule: See start dates in the run coordination meeting pages here and the general schedule here. Duration of the Regular Data Collection: 9.5 days
  1. Conditions:
    • Tagger hall equipment in place and operating.
    • Beam 50 - 100 nA CW
    • Radiator is 0.2 - 1.0 10-4.
    • Collimator hole is 5 mm.
    • Solenoid 1200A.
    • GlueX detectors are on.
    • Commissioning targets at various positions.
  2. Activities
    • Commission the trigger [trigger commissioning page ]: Expert: A. Somov
    • Take data with the expected "low intensity" conditions of 10 MHz/GeV photons: 100 nA, 10-4 RL radiator, 5 mm collimator and the 10 mm plastic target at the regular position. These conditions are close to the "low intensity" settings of GlueX experiment. Verify the rates and backgrounds. 1 shift.
    • Take data for preliminary calibration and alignment of the detector: the rest of the scheduled time.