Instruction on Special Procedures and Operations
Fixes to complicated Issues
Symptom of the problem:
Solution
- General -> Status of Voltages and then “RESET INTERLOCK” for D2_8_MID (picture below).
Installation and uninstallation of South DIR Box c2r18
Since the incorrect installation/removal process will cause serious damage to the fiber or PMT, as the first step of this operation, one must obtain permission from Justin Stevens.
- Due to the fact the South DIRC box c2r18 doesn't have RTV cookie, therefore, a special installation and uninstallation procedure is required, installation is given: https://logbooks.jlab.org/entry/3860930. (This is for documentation only donot use)
- See update-to-date instruction: https://logbooks.jlab.org/entry/3862103