Search results

Jump to: navigation, search
  • * [[Beam Line Detectors Shift | Beam Line Detectors: Radiators, Goniometer, Harps, Sweep]] [[Hall D Commissioning]]
    9 KB (1,209 words) - 08:12, 11 March 2024
  • ==Commissioning and Running Plans== * [[Fall 2014 Commissioning Plan]]
    2 KB (185 words) - 11:46, 29 September 2016
  • '''This page gives the run plan for the Fall 2014 commissioning. It is a controlled document that can be edited only by E. Chudakov, E. Smi This document describes the run plan and procedures for the Hall D Fall 2014 commissioning.
    7 KB (1,119 words) - 16:28, 26 November 2018
  • ==[[Fall 2014 Commissioning Plan#Tune Photon Beam|Main Page]]== ==[[Tune Electron Beam]]==
    13 KB (1,947 words) - 16:45, 14 August 2014
  • ==Tune Photon Beam== ...through the collimator, the experimental target area, and into the photon beam dump.
    16 KB (2,399 words) - 09:06, 31 October 2014
  • '''This page gives the run plan for the Spring 2015 commissioning. It is a controlled document that can be edited only by E. Chudakov, E. Smi ...document describes the run plan and procedures for the Hall D spring 2015 commissioning.
    16 KB (2,506 words) - 16:28, 26 November 2018
  • ...This supersedes the [[Spring 2015 Commissioning Plan|original Spring 2015 Commissioning Plan]]. ...plan and procedures for the Hall D spring 2015 commissioning with 5.5 GeV beam.
    19 KB (2,941 words) - 16:48, 17 April 2015
  • commissioning. The hall operations were opportunistic. In total Hall D received about a week of intermittent beam.
    2 KB (312 words) - 11:36, 17 January 2019