Search results

Jump to: navigation, search
  • * [[Data Acquisition Shift | Data Acquisition]] * [https://halldweb.jlab.org/wiki/index.php/Online_Monitoring_Data_Validation Data Validation]
    9 KB (1,209 words) - 08:12, 11 March 2024
  • ...ing. It occured between Dec. 15th 2016 and Dec. 21st 2016. Little physics data were taken, but the DAQ, Trigger optimization as well as studies of their p # Enough data taking for global checkout/calibration.
    14 KB (2,392 words) - 19:09, 14 February 2017
  • ==Commissioning and Running Plans== * [[Fall 2014 Commissioning Plan]]
    2 KB (185 words) - 11:46, 29 September 2016
  • ==[[Fall 2014 Commissioning Plan#Tune Photon Beam|Main Page]]== ** Oct 12 - Oct 31 (Finalize photon beam commissioning. Detector commissioning): 20 days
    13 KB (1,947 words) - 16:45, 14 August 2014
  • # Scaler acquisition operational for rate azimuthal asymmetry monitoring and initial detector st ## (Moderate) If the Active Collimator data provides a better position accuracy - move the beam in X accordingly (time
    16 KB (2,399 words) - 09:06, 31 October 2014
  • ...of the GUI. The files are automatically saved with the date/time to /gluex/data/burt/voltages/BCAL_BIAS/. We have renamed the files incorporating the date/ ...s possible for LED pulses from one side the the BCAL to not show up in the data stream.
    24 KB (3,825 words) - 18:41, 11 January 2023