Summary of the Spring 2017 run

The main goal of the run was GlueX data Production. In addition, several tests were planned: High-intensity GlueX test, TPol low photon energy study, ComCAL prototype test and TRD test.

The start of the Spring 2017 run went extremely well compared to our other runs. Overall 50.1*10^9 triggers were taken, including 7.710^9 on amorphous radiator. A little less than half of the triggers were taken with high-intensity. However, the run was interrupted by a CHL trip that occurred around 10:30pm on 3/9, which marked the end of the Spring 2017 run.