Difference between revisions of "Tune Electron Beam"
From Hall D Ops Wiki
Line 17: | Line 17: | ||
# Radiation monitors installed and operational <span style="font-size:21px">☑</span> | # Radiation monitors installed and operational <span style="font-size:21px">☑</span> | ||
#* Responsibility: Alexandre Deur (CARMS)/Hovanes Egyian (halo counters) | #* Responsibility: Alexandre Deur (CARMS)/Hovanes Egyian (halo counters) | ||
− | #* [https://hdops.jlab.org/wiki/index.php/ | + | #* [https://hdops.jlab.org/wiki/index.php/How_to_read_temporary_CARMS Procedure to monitor CARMs] |
# Upstream Profiler installed in front of the collimator <span style="font-size:21px">☑</span> | # Upstream Profiler installed in front of the collimator <span style="font-size:21px">☑</span> | ||
# Downstream Profiler installed in front of photon beam dump <span style="font-size:21px">☑</span> | # Downstream Profiler installed in front of photon beam dump <span style="font-size:21px">☑</span> |
Revision as of 07:38, 21 October 2014
- Goal: provide a clean electron beam through the center of the beam aperture to the beam dump in the tagger hall with acceptable radiation levels.
- Priority: High
- Link to the accelerator test plan for electron beam commissioning (ATLIS)
- Expected duration:
- 4 days: Tune beam to Hall D line dumplette (Tagger Hall can remain open).
- 3 days: Tune beam to Tagger Hall D (Tagger Hall and Hall D must be closed).
- Prerequisites:
- Tagger microscope (TAGM) and all the crates with electronics removed from Hall D. ☑
- Goniometer in the beam-open position. The goniometer will not be used during the 2014 run. ☑
- Amorphous radiator ladder equipped and operational ☑
- Responsibility: Hovanes Egiyan.
- Beam lines under vacuum ☑
- Tagger magnet operational ☑
- Responsibility: MCC
- Shielding walls installed ☑
- Radiation monitors installed and operational ☑
- Responsibility: Alexandre Deur (CARMS)/Hovanes Egyian (halo counters)
- Procedure to monitor CARMs
- Upstream Profiler installed in front of the collimator ☑
- Downstream Profiler installed in front of photon beam dump ☑
- Conditions:
- Pulsed beam pulsed beam 4-10 µA (average 60-150 nA) for the beam tune
- CW beam 50-100 nA at the final stage of the procedure
- Primary collimator block in the position between two holes, shielding the central area of the beam pipe . Secondary collimator removed. ☑
- Responsibility: Hovanes Egiyan.
- Procedure for moving Primary Collimator
- Vacuum window covers removed (7 window covers)
- No radiator inserted.
- Responsibility: Hovanes Egiyan.
- Procedure for inserting/removing amorphous radiators
- No shift workers in Hall D except if needed. RC and/or other Hall D personnel follows the beam tuning procedure at the MCC.